Cost of water acquisition from forested watershed

Estimation of the cost of water acquisition from two watershed, namely Sungai Teranum catchment area and Sungai Sia catchment area in Raub, Pahang, from the overall cost of managing the watershed by the Pahang State Forestry Department was conducted. Field measurements of river flow velocity and cro...

Full description

Saved in:
Bibliographic Details
Main Authors: Zulkeflee, Zufarzaana, Mohamad Pauzi, Jinan, Yusoff, Mohd Kamil, Jamil, Nor Rohaizah
Format: Article
Language:English
Published: Elsevier 2015
Online Access:http://psasir.upm.edu.my/id/eprint/47819/1/47819.pdf
http://psasir.upm.edu.my/id/eprint/47819/
http://www.sciencedirect.com/science/article/pii/S1878029615006544
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.47819
record_format eprints
spelling my.upm.eprints.478192016-07-13T04:47:14Z http://psasir.upm.edu.my/id/eprint/47819/ Cost of water acquisition from forested watershed Zulkeflee, Zufarzaana Mohamad Pauzi, Jinan Yusoff, Mohd Kamil Jamil, Nor Rohaizah Estimation of the cost of water acquisition from two watershed, namely Sungai Teranum catchment area and Sungai Sia catchment area in Raub, Pahang, from the overall cost of managing the watershed by the Pahang State Forestry Department was conducted. Field measurements of river flow velocity and cross-sectional area of the rivers were conducted and the average flow rates (m3/s) were determined using the formula Q=VA. It is estimated that the cost of 1 m3 of water generated from the Sungai Teranum catchment with an average water yield of 13868498.29 m3/yr is RM 0.0019 and RM 0.00069 from the Sungai Sia catchment with an average water yield of 113345052.96 m3/yr. Elsevier 2015 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/47819/1/47819.pdf Zulkeflee, Zufarzaana and Mohamad Pauzi, Jinan and Yusoff, Mohd Kamil and Jamil, Nor Rohaizah (2015) Cost of water acquisition from forested watershed. Procedia Environmental Sciences, 30. pp. 338-343. ISSN 1878-0296 http://www.sciencedirect.com/science/article/pii/S1878029615006544 10.1016/j.proenv.2015.10.060
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
description Estimation of the cost of water acquisition from two watershed, namely Sungai Teranum catchment area and Sungai Sia catchment area in Raub, Pahang, from the overall cost of managing the watershed by the Pahang State Forestry Department was conducted. Field measurements of river flow velocity and cross-sectional area of the rivers were conducted and the average flow rates (m3/s) were determined using the formula Q=VA. It is estimated that the cost of 1 m3 of water generated from the Sungai Teranum catchment with an average water yield of 13868498.29 m3/yr is RM 0.0019 and RM 0.00069 from the Sungai Sia catchment with an average water yield of 113345052.96 m3/yr.
format Article
author Zulkeflee, Zufarzaana
Mohamad Pauzi, Jinan
Yusoff, Mohd Kamil
Jamil, Nor Rohaizah
spellingShingle Zulkeflee, Zufarzaana
Mohamad Pauzi, Jinan
Yusoff, Mohd Kamil
Jamil, Nor Rohaizah
Cost of water acquisition from forested watershed
author_facet Zulkeflee, Zufarzaana
Mohamad Pauzi, Jinan
Yusoff, Mohd Kamil
Jamil, Nor Rohaizah
author_sort Zulkeflee, Zufarzaana
title Cost of water acquisition from forested watershed
title_short Cost of water acquisition from forested watershed
title_full Cost of water acquisition from forested watershed
title_fullStr Cost of water acquisition from forested watershed
title_full_unstemmed Cost of water acquisition from forested watershed
title_sort cost of water acquisition from forested watershed
publisher Elsevier
publishDate 2015
url http://psasir.upm.edu.my/id/eprint/47819/1/47819.pdf
http://psasir.upm.edu.my/id/eprint/47819/
http://www.sciencedirect.com/science/article/pii/S1878029615006544
_version_ 1643833991974879232
score 13.18916