Monitoring aspects in EIA reports
As per the Environmental Impact Assessment Order, 1987, Malaysia, during the E.I.A study, monitoring plan needs to be proposed based on the significance of the predicted potential environmental impacts. This study reviewed monitoring aspects of 50 EIA reports prepared on several prescribed activitie...
Saved in:
Main Authors: | Rahman, Md. Mizanur, Daud, Mohammed, Bardaie, Mohd Zohadie, Hassan, Mohd Nasir |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
Universiti Putra Malaysia
1999
|
Online Access: | http://psasir.upm.edu.my/id/eprint/38751/1/38751.pdf http://psasir.upm.edu.my/id/eprint/38751/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A knowledge-based expert system for EIA using blackboard approach
by: Jazzar, Moneef Mohammad Abdel-Kareem, et al.
Published: (1998) -
A cooperative multi-agent approach in developing a knowledge based system for EIA
by: Jazzar, Moneef Mohammad Abdel-Kareem, et al.
Published: (1999) -
Are EIA reports addressing all environmental concerns?
by: Anon
Published: (2013) -
UNIMAS assigned to carry out EIA report
by: The Borneo Post
Published: (1994) -
Development of A Knowledge•Based Compliance Auditing System for Environmental Impact Assessment (EIA) Projects in Malaysia
by: Rahman, Md. Mizanur
Published: (2001)