Component procurement incorporating associated cost for make to order capicated production
Component procurement strategy in multi echelon production-inventory systems over the last decades have been recognized and discussed as a crucial issue that plays an important role in punctuality of delivery of final products. The echelon inventory concept has been applied widely in characterizati...
Saved in:
Main Author: | Vasili, Mehdi |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2012
|
Online Access: | http://psasir.upm.edu.my/id/eprint/38548/1/FK%202012%2017R.pdf http://psasir.upm.edu.my/id/eprint/38548/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of fixed order period lot sizing rule in capacitated make-to-order production systems
by: Tang, Sai Hong, et al.
Published: (2013) -
Transaction cost components in bim procurement: a preliminary study
by: Muzani Mustapa, Toh Ka Bean
Published: (2018) -
Unbundling transaction costs components in building information modeling adopted procurement
by: Toh, K. B., et al.
Published: (2019) -
A preliminary review on transaction cost components within the BIM adopted procurements
by: Toh, Ka Bean, et al.
Published: (2019) -
The legal aspect of procurement system - doctrine of variation order with respect to design and build procurement system
by: Abdul Majid, Masidah
Published: (2011)