Evaluation of Some Proposed Methods for Protecting Bridge Substructure Using Physical Models
Bridges constructed across streams with erodable beds are normally subjected to serious scouring during the flood at piers and abutment sites. As a result, scour holes will be formed at the bridge substructure. The scour hole can be described by its maximum vertical scour depth which is called lo...
Saved in:
Main Authors: | , , , , , , |
---|---|
Format: | Article |
Language: | English English |
Published: |
Universiti Putra Malaysia Press
2003
|
Online Access: | http://psasir.upm.edu.my/id/eprint/3755/1/Evaluation_of_Some_Proposed_Methods_for_Protecting_Bridge.pdf http://psasir.upm.edu.my/id/eprint/3755/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.upm.eprints.3755 |
---|---|
record_format |
eprints |
spelling |
my.upm.eprints.37552013-05-27T07:10:59Z http://psasir.upm.edu.my/id/eprint/3755/ Evaluation of Some Proposed Methods for Protecting Bridge Substructure Using Physical Models Mohammed, Thamer Ahmed Jafaar, Mohd Saleh Thanoon, Waleed Abdulmalik Ghazali, Abdul Halim Megat Mohd Noor, Megat Johari Yusuf, Badronnisa Salem, Mohammed Bridges constructed across streams with erodable beds are normally subjected to serious scouring during the flood at piers and abutment sites. As a result, scour holes will be formed at the bridge substructure. The scour hole can be described by its maximum vertical scour depth which is called local scour depth and by the size of its projected scour area. Experience has shown that progressive depth of scour holes at the site of bridge substructures could undermine the foundation and result in bridge failure. Protection against scouring for constructed bridges is necessary to minimize the risk of failure. The formation of the scour hole at the bridge substructure is considered as very complex and this phenomenon is so involved that only very limited success has been made to predict the size of the scour hole computationally. Physical model remains the principal tool employed for estimating the size of scour hole at the site of bridge substructure. In this study, the efficiency of five different proposed methods of protecting the bridge substructure were tested using a physical model. These methods are piers with collar, pier with multiple collars, pier with slot, piles in front of piers, and using riprap. The physical model comprises a tilted flume (5 m long, 76 mm wide and 250 mm high) with sand on its bed (nominal size =0.35 mm) and a single circular cylindrical pier model which was made of hard teak wood (diameter =16 mm). A collar form steel with a diameter of 40 mm was attached to the pier model. A slot of a dimension 7 mm x 20 mm (width x depth) was opened in the upper side of the pier. Steel nails 3 mm in diameter each were used to simulate the piles. Coarse graded gravel was used as a riprap. Data collected from the physical model showed that using multiple collars around the pier can give 88% reduction in the scour area while the reduction in the maximum scour depth ranges from 73% to 64%, depending on the flow rate in the flume. It was observed that the riprap protection at the bridge substructure is also effective in reducing the maximum scour depth and reduction ranges from 100% to 68%. However, the reduction in the scour area ranges from 100% to 83%. The reduction was also dependent on the flow rate. Universiti Putra Malaysia Press 2003 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/3755/1/Evaluation_of_Some_Proposed_Methods_for_Protecting_Bridge.pdf Mohammed, Thamer Ahmed and Jafaar, Mohd Saleh and Thanoon, Waleed Abdulmalik and Ghazali, Abdul Halim and Megat Mohd Noor, Megat Johari and Yusuf, Badronnisa and Salem, Mohammed (2003) Evaluation of Some Proposed Methods for Protecting Bridge Substructure Using Physical Models. Pertanika Journal of Science & Technology, 11 (2). pp. 229-236. ISSN 0128-7680 English |
institution |
Universiti Putra Malaysia |
building |
UPM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Putra Malaysia |
content_source |
UPM Institutional Repository |
url_provider |
http://psasir.upm.edu.my/ |
language |
English English |
description |
Bridges constructed across streams with erodable beds are normally subjected
to serious scouring during the flood at piers and abutment sites. As a result,
scour holes will be formed at the bridge substructure. The scour hole can be
described by its maximum vertical scour depth which is called local scour depth and by the size of its projected scour area. Experience has shown that
progressive depth of scour holes at the site of bridge substructures could
undermine the foundation and result in bridge failure. Protection against
scouring for constructed bridges is necessary to minimize the risk of failure.
The formation of the scour hole at the bridge substructure is considered as very
complex and this phenomenon is so involved that only very limited success has
been made to predict the size of the scour hole computationally. Physical
model remains the principal tool employed for estimating the size of scour
hole at the site of bridge substructure. In this study, the efficiency of five
different proposed methods of protecting the bridge substructure were tested
using a physical model. These methods are piers with collar, pier with multiple
collars, pier with slot, piles in front of piers, and using riprap. The physical
model comprises a tilted flume (5 m long, 76 mm wide and 250 mm high) with
sand on its bed (nominal size =0.35 mm) and a single circular cylindrical pier
model which was made of hard teak wood (diameter =16 mm). A collar form
steel with a diameter of 40 mm was attached to the pier model. A slot of a
dimension 7 mm x 20 mm (width x depth) was opened in the upper side of
the pier. Steel nails 3 mm in diameter each were used to simulate the piles.
Coarse graded gravel was used as a riprap. Data collected from the physical
model showed that using multiple collars around the pier can give 88%
reduction in the scour area while the reduction in the maximum scour depth
ranges from 73% to 64%, depending on the flow rate in the flume. It was
observed that the riprap protection at the bridge substructure is also effective
in reducing the maximum scour depth and reduction ranges from 100% to
68%. However, the reduction in the scour area ranges from 100% to 83%. The
reduction was also dependent on the flow rate. |
format |
Article |
author |
Mohammed, Thamer Ahmed Jafaar, Mohd Saleh Thanoon, Waleed Abdulmalik Ghazali, Abdul Halim Megat Mohd Noor, Megat Johari Yusuf, Badronnisa Salem, Mohammed |
spellingShingle |
Mohammed, Thamer Ahmed Jafaar, Mohd Saleh Thanoon, Waleed Abdulmalik Ghazali, Abdul Halim Megat Mohd Noor, Megat Johari Yusuf, Badronnisa Salem, Mohammed Evaluation of Some Proposed Methods for Protecting Bridge Substructure Using Physical Models |
author_facet |
Mohammed, Thamer Ahmed Jafaar, Mohd Saleh Thanoon, Waleed Abdulmalik Ghazali, Abdul Halim Megat Mohd Noor, Megat Johari Yusuf, Badronnisa Salem, Mohammed |
author_sort |
Mohammed, Thamer Ahmed |
title |
Evaluation of Some Proposed Methods for Protecting Bridge
Substructure Using Physical Models |
title_short |
Evaluation of Some Proposed Methods for Protecting Bridge
Substructure Using Physical Models |
title_full |
Evaluation of Some Proposed Methods for Protecting Bridge
Substructure Using Physical Models |
title_fullStr |
Evaluation of Some Proposed Methods for Protecting Bridge
Substructure Using Physical Models |
title_full_unstemmed |
Evaluation of Some Proposed Methods for Protecting Bridge
Substructure Using Physical Models |
title_sort |
evaluation of some proposed methods for protecting bridge
substructure using physical models |
publisher |
Universiti Putra Malaysia Press |
publishDate |
2003 |
url |
http://psasir.upm.edu.my/id/eprint/3755/1/Evaluation_of_Some_Proposed_Methods_for_Protecting_Bridge.pdf http://psasir.upm.edu.my/id/eprint/3755/ |
_version_ |
1643822703495348224 |
score |
13.211869 |