Cab transfer process improvement at an automotive manufacturing facility

This project is related to the improvement of cab transfer process from Painted Body Storage (PBS) area to General Assembly (GA) line. The objectives of this project are to eliminate the root cause of cab defect and to streamline the transfer process with the reduction of process cycle time. From th...

Full description

Saved in:
Bibliographic Details
Main Authors: Kasim, Nazrul Idzham, Leman, Zulkiflle, Musa, Mohd Azam, Baharudin, B. T. Hang Tuah
Format: Article
Language:English
Published: Trans Tech Publications 2014
Online Access:http://psasir.upm.edu.my/id/eprint/36691/1/Cab%20transfer%20process%20improvement%20at%20an%20automotive%20manufacturing%20facility.pdf
http://psasir.upm.edu.my/id/eprint/36691/
http://www.scientific.net/AMM.564.105
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items