Construction cost comparison between conventional and formwork system for condominium project

Based on recent scenario, Malaysia has emerged towards industrialization in all aspects of development. Most significantly, construction industry in Malaysia has transformed into a transitional paradigm changed, from the conventional system technology towards a more systematically, mechanized and in...

Full description

Saved in:
Bibliographic Details
Main Authors: Md. Rahim, Mohd Syazwan, Haron, Nuzul Azam
Format: Article
Language:English
Published: International Association of Academicians, Scholars, Scientists & Engineers 2013
Online Access:http://psasir.upm.edu.my/id/eprint/28709/1/Construction%20cost%20comparison%20between%20conventional%20and%20formwork%20system%20for%20condominium%20project.pdf
http://psasir.upm.edu.my/id/eprint/28709/
http://www.ijascse.org/volume-2-issue-5/Construction-cost-comparision.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.28709
record_format eprints
spelling my.upm.eprints.287092015-10-08T00:27:56Z http://psasir.upm.edu.my/id/eprint/28709/ Construction cost comparison between conventional and formwork system for condominium project Md. Rahim, Mohd Syazwan Haron, Nuzul Azam Based on recent scenario, Malaysia has emerged towards industrialization in all aspects of development. Most significantly, construction industry in Malaysia has transformed into a transitional paradigm changed, from the conventional system technology towards a more systematically, mechanized and industrialized forms, which adopted the latest and modernized technology. The transformation and innovation of this technology has evolved out of a tremendous backlog in the construction of the commercial and residential buildings. Apparently, the so-called ‘Industrialised Building System’ (IBS) is one of the major constituents in the construction systems. This system has been regulated and varied in a completely different manner compared to the conventional construction system, thus effected the design, construction method statements and most importantly the cost implications (CIDB, 2000). A case study was carried out by the researcher. The data required for this case study was generated through interviews. From the results of the case study, it undertaken can be concluded that the Industrialised Building System is better construction cost saving as compared to the conventional system. International Association of Academicians, Scholars, Scientists & Engineers 2013 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/28709/1/Construction%20cost%20comparison%20between%20conventional%20and%20formwork%20system%20for%20condominium%20project.pdf Md. Rahim, Mohd Syazwan and Haron, Nuzul Azam (2013) Construction cost comparison between conventional and formwork system for condominium project. International Journal of Advanced Studies in Computer Science and Engineering, 2 (5). pp. 19-25. ISSN 2278-7917 http://www.ijascse.org/volume-2-issue-5/Construction-cost-comparision.pdf
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
description Based on recent scenario, Malaysia has emerged towards industrialization in all aspects of development. Most significantly, construction industry in Malaysia has transformed into a transitional paradigm changed, from the conventional system technology towards a more systematically, mechanized and industrialized forms, which adopted the latest and modernized technology. The transformation and innovation of this technology has evolved out of a tremendous backlog in the construction of the commercial and residential buildings. Apparently, the so-called ‘Industrialised Building System’ (IBS) is one of the major constituents in the construction systems. This system has been regulated and varied in a completely different manner compared to the conventional construction system, thus effected the design, construction method statements and most importantly the cost implications (CIDB, 2000). A case study was carried out by the researcher. The data required for this case study was generated through interviews. From the results of the case study, it undertaken can be concluded that the Industrialised Building System is better construction cost saving as compared to the conventional system.
format Article
author Md. Rahim, Mohd Syazwan
Haron, Nuzul Azam
spellingShingle Md. Rahim, Mohd Syazwan
Haron, Nuzul Azam
Construction cost comparison between conventional and formwork system for condominium project
author_facet Md. Rahim, Mohd Syazwan
Haron, Nuzul Azam
author_sort Md. Rahim, Mohd Syazwan
title Construction cost comparison between conventional and formwork system for condominium project
title_short Construction cost comparison between conventional and formwork system for condominium project
title_full Construction cost comparison between conventional and formwork system for condominium project
title_fullStr Construction cost comparison between conventional and formwork system for condominium project
title_full_unstemmed Construction cost comparison between conventional and formwork system for condominium project
title_sort construction cost comparison between conventional and formwork system for condominium project
publisher International Association of Academicians, Scholars, Scientists & Engineers
publishDate 2013
url http://psasir.upm.edu.my/id/eprint/28709/1/Construction%20cost%20comparison%20between%20conventional%20and%20formwork%20system%20for%20condominium%20project.pdf
http://psasir.upm.edu.my/id/eprint/28709/
http://www.ijascse.org/volume-2-issue-5/Construction-cost-comparision.pdf
_version_ 1643829545245081600
score 13.18916