Dam Overtopping risk using probabilistic concepts - Case Study: The Meijaran Dam, Iran.
Hydrologic risk assessment and uncertainty analysis by mathematical and statistical methods provide useful information for decision makers. This study presents the application of risk and uncertainty analysis to dam overtopping due to various inflows and wind speeds for the Meijaran Dam in the north...
Saved in:
Main Authors: | Lee, Teang Shui, Goodarzi, Ehsan, Ziaei, Mina |
---|---|
Format: | Article |
Language: | English English |
Published: |
2013
|
Online Access: | http://psasir.upm.edu.my/id/eprint/28565/1/Dam%20Overtopping%20risk%20using%20probabilistic%20concepts.pdf http://psasir.upm.edu.my/id/eprint/28565/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Overtopping risk and uncertainty analysis of embankment dams
by: Goodarzi, Ehsan
Published: (2010) -
Simulated optimization of reservoir operations of the Zayandehrud dam, Iran
by: Ziaei, Mina
Published: (2010) -
Erodable dam breaching patterns due to overtopping
by: Mat Lazin, Nor Ain
Published: (2014) -
RCC Dam Design Concept Of The Sungai Kinta Dam (SKD) Perak
by: Abang Abdullah, Dayang Norehan
Published: (2006) -
Inflow Forecasting For Temenggor Dam Under Dam Sustainability And Risk Management
by: Muhammad Hafeez Bin Hassan
Published: (2023)