High breakdown estimators to robustify phase II multivariate control charts.

Control chart is a statistical process control tool that is used to monitor the changes in a process. Hotelling's T2 chart is one of the most popular control charts for monitoring independently and identically distributed random vectors. This chart detects many types of out-of-control signals,...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammadi, M., Midi, Habshah, Arasan, Jayanthi, Al-Talib, B.
Format: Article
Language:English
English
Published: Asian Network for Scientific Information 2011
Online Access:http://psasir.upm.edu.my/id/eprint/24754/1/High%20breakdown%20estimators%20to%20robustify%20phase%20II%20multivariate%20control%20charts.pdf
http://psasir.upm.edu.my/id/eprint/24754/
http://www.ansinet.com/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.24754
record_format eprints
spelling my.upm.eprints.247542015-10-20T00:03:54Z http://psasir.upm.edu.my/id/eprint/24754/ High breakdown estimators to robustify phase II multivariate control charts. Mohammadi, M. Midi, Habshah Arasan, Jayanthi Al-Talib, B. Control chart is a statistical process control tool that is used to monitor the changes in a process. Hotelling's T2 chart is one of the most popular control charts for monitoring independently and identically distributed random vectors. This chart detects many types of out-of-control signals, but it is not sensitive to small shifts in the mean vector. This study propose a more efficient T2 control charts based on the re-weigted robust estimators of location and dispersion. The proposed control charts are attained by substituting the classical estimators of the mean vector and covariance matrix in the Hotelling's T2 by the re-weighted MCD and re-weighted MVE estimators. In this study, Monte Carlo simulations were carried out to establish the proposed robust control limit. Following that, we suggested suitable estimators for each condition. Our advice in this study is replacing the classical mean vector and covariance matrix of the data in the Hotelling's T2 statistic by there weighted MCD and Re-weighted MVE estimators. Asian Network for Scientific Information 2011 Article PeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/24754/1/High%20breakdown%20estimators%20to%20robustify%20phase%20II%20multivariate%20control%20charts.pdf Mohammadi, M. and Midi, Habshah and Arasan, Jayanthi and Al-Talib, B. (2011) High breakdown estimators to robustify phase II multivariate control charts. Journal of Applied Sciences, 11 (3). pp. 503-511. ISSN 1812-5654, ESSN: 1812-5662 http://www.ansinet.com/ 10.3923/jas.2011.503.511 English
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
English
description Control chart is a statistical process control tool that is used to monitor the changes in a process. Hotelling's T2 chart is one of the most popular control charts for monitoring independently and identically distributed random vectors. This chart detects many types of out-of-control signals, but it is not sensitive to small shifts in the mean vector. This study propose a more efficient T2 control charts based on the re-weigted robust estimators of location and dispersion. The proposed control charts are attained by substituting the classical estimators of the mean vector and covariance matrix in the Hotelling's T2 by the re-weighted MCD and re-weighted MVE estimators. In this study, Monte Carlo simulations were carried out to establish the proposed robust control limit. Following that, we suggested suitable estimators for each condition. Our advice in this study is replacing the classical mean vector and covariance matrix of the data in the Hotelling's T2 statistic by there weighted MCD and Re-weighted MVE estimators.
format Article
author Mohammadi, M.
Midi, Habshah
Arasan, Jayanthi
Al-Talib, B.
spellingShingle Mohammadi, M.
Midi, Habshah
Arasan, Jayanthi
Al-Talib, B.
High breakdown estimators to robustify phase II multivariate control charts.
author_facet Mohammadi, M.
Midi, Habshah
Arasan, Jayanthi
Al-Talib, B.
author_sort Mohammadi, M.
title High breakdown estimators to robustify phase II multivariate control charts.
title_short High breakdown estimators to robustify phase II multivariate control charts.
title_full High breakdown estimators to robustify phase II multivariate control charts.
title_fullStr High breakdown estimators to robustify phase II multivariate control charts.
title_full_unstemmed High breakdown estimators to robustify phase II multivariate control charts.
title_sort high breakdown estimators to robustify phase ii multivariate control charts.
publisher Asian Network for Scientific Information
publishDate 2011
url http://psasir.upm.edu.my/id/eprint/24754/1/High%20breakdown%20estimators%20to%20robustify%20phase%20II%20multivariate%20control%20charts.pdf
http://psasir.upm.edu.my/id/eprint/24754/
http://www.ansinet.com/
_version_ 1643828455801880576
score 13.211869