Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia

The entire Tanjung Karang rice growing area of about 20,000 hectares is served by four LPN integrated rice drying and milling complexes which are located in Sekinchan, Ulu Tiram Buruk, Kuala Selangor and Sungai Besar. The total amount of paddy received daily by the four complexes during peak period...

Full description

Saved in:
Bibliographic Details
Main Authors: Ibrahim, Mohd. Nordin, Abdullah, Wan Mohamad
Format: Conference or Workshop Item
Language:English
Published: 1987
Online Access:http://psasir.upm.edu.my/id/eprint/18019/1/ID%2018019.pdf
http://psasir.upm.edu.my/id/eprint/18019/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.18019
record_format eprints
spelling my.upm.eprints.180192015-01-09T07:51:03Z http://psasir.upm.edu.my/id/eprint/18019/ Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia Ibrahim, Mohd. Nordin Abdullah, Wan Mohamad The entire Tanjung Karang rice growing area of about 20,000 hectares is served by four LPN integrated rice drying and milling complexes which are located in Sekinchan, Ulu Tiram Buruk, Kuala Selangor and Sungai Besar. The total amount of paddy received daily by the four complexes during peak period is about 1000 tonnes per day and this amount is shared between the four complexes in the ratio of 2:2:2:1 respectively. Field observations were carried out to assess the entire operations of the post harvest system within the vicinity of the LPN complexes at Sekinchan and Ulu Tiram Buruk. The post harvest system includes harvesting operation; activities at purchasing centers; transportation and delivery to LPN complexes; management, handling and drying operations mainly at Sekinchan LPN complex. Evaluation of these observations was done to identify specific problems and to offer alternatives for correction and improvement. The major problem is that the drying and handling capacity of the present main drying system (LSU Dryer) is able to meet only about 50% to 60% of the paddy delivered during peak periods (3 to 6 weeks). Since any effort to improve handling and drying efficients of the present system would not elleviate substantially the problem of undercapacity, it is therefore proposed to expand the drying capacity of the complex by incorporating a predrying section comprising of an additional system of dryer complete with handling and complementary tempering/temporary storage facilities. The improvement of the operation of the present system is also stressed. By this approach it is then forseen that the current drying backlog could be overcome. 1987 Conference or Workshop Item NonPeerReviewed application/pdf en http://psasir.upm.edu.my/id/eprint/18019/1/ID%2018019.pdf Ibrahim, Mohd. Nordin and Abdullah, Wan Mohamad (1987) Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia. In: Consultative Workshop on Grain Drying and Rice Milling in Asean, 24-27 Nov. 1987, Hyatt Central Plaza Hotel, Bangkok, Thailand. .
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
description The entire Tanjung Karang rice growing area of about 20,000 hectares is served by four LPN integrated rice drying and milling complexes which are located in Sekinchan, Ulu Tiram Buruk, Kuala Selangor and Sungai Besar. The total amount of paddy received daily by the four complexes during peak period is about 1000 tonnes per day and this amount is shared between the four complexes in the ratio of 2:2:2:1 respectively. Field observations were carried out to assess the entire operations of the post harvest system within the vicinity of the LPN complexes at Sekinchan and Ulu Tiram Buruk. The post harvest system includes harvesting operation; activities at purchasing centers; transportation and delivery to LPN complexes; management, handling and drying operations mainly at Sekinchan LPN complex. Evaluation of these observations was done to identify specific problems and to offer alternatives for correction and improvement. The major problem is that the drying and handling capacity of the present main drying system (LSU Dryer) is able to meet only about 50% to 60% of the paddy delivered during peak periods (3 to 6 weeks). Since any effort to improve handling and drying efficients of the present system would not elleviate substantially the problem of undercapacity, it is therefore proposed to expand the drying capacity of the complex by incorporating a predrying section comprising of an additional system of dryer complete with handling and complementary tempering/temporary storage facilities. The improvement of the operation of the present system is also stressed. By this approach it is then forseen that the current drying backlog could be overcome.
format Conference or Workshop Item
author Ibrahim, Mohd. Nordin
Abdullah, Wan Mohamad
spellingShingle Ibrahim, Mohd. Nordin
Abdullah, Wan Mohamad
Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia
author_facet Ibrahim, Mohd. Nordin
Abdullah, Wan Mohamad
author_sort Ibrahim, Mohd. Nordin
title Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia
title_short Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia
title_full Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia
title_fullStr Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia
title_full_unstemmed Status of padi drying operation and improvement strategy at LPN complex in Sekinchan Selangor, Malaysia
title_sort status of padi drying operation and improvement strategy at lpn complex in sekinchan selangor, malaysia
publishDate 1987
url http://psasir.upm.edu.my/id/eprint/18019/1/ID%2018019.pdf
http://psasir.upm.edu.my/id/eprint/18019/
_version_ 1643826691665035264
score 13.18916