Cost Control Strategies For Ibs Contractors In Malaysia

Industrialised Building System (IBS) is a system widely used in construction industry in Malaysia. This study is a survey to identify the factors contributing to cost control problems faced by local contractors in IBS projects and to identify the strategies used to reduce the cost variation in IB...

Full description

Saved in:
Bibliographic Details
Main Author: Lew, Yoke Lian
Format: Thesis
Language:English
English
Published: 2002
Subjects:
Online Access:http://psasir.upm.edu.my/id/eprint/12077/1/FK_2002_42.pdf
http://psasir.upm.edu.my/id/eprint/12077/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.12077
record_format eprints
spelling my.upm.eprints.120772024-06-28T01:16:27Z http://psasir.upm.edu.my/id/eprint/12077/ Cost Control Strategies For Ibs Contractors In Malaysia Lew, Yoke Lian Industrialised Building System (IBS) is a system widely used in construction industry in Malaysia. This study is a survey to identify the factors contributing to cost control problems faced by local contractors in IBS projects and to identify the strategies used to reduce the cost variation in IBS projects. From the finding of the survey, a computer-based cost control model was developed to improve the effectiveness of cost control on IBS. The survey shows that management team capability & performance, buildability of design, and timely decision making were the top-ranked factors contributing to cost control problems in IBS construction in Malaysia. Strategies like increase the working hours, increase manpower and/or equipment, provide close supervision to subordinates for minimising abortive work, and coordinate closely with subcontractors were identified as the most popular method used to reduce cost variation of IBS projects. In hypotheses testing of this study, it was found that there is significant association between type of IBS used and the perceived contributor to cost control problems.Results of Logistic Regression Analysis shows that allowance of partially handover, delay of payment from client to the contractor, deposit needed for IBS before delivery of the precast components, and application of tracking curve for cost control are likely to influence the cost variance of IBS construction projects. The developed computer-based cost control model could assist constructor of IBS (with prefabricated elements) to plan their expenses and progress of work. Additionally, monitoring during the construction is made available through a series of user-friendly electronic forms. With identification of potential problem contributors, strategies to overcome cost variation, and application of the cost control model, cost control of IBS projects in Malaysia would be unproblematic to any new or existing IBS practitioners. 2002-08 Thesis NonPeerReviewed text en http://psasir.upm.edu.my/id/eprint/12077/1/FK_2002_42.pdf Lew, Yoke Lian (2002) Cost Control Strategies For Ibs Contractors In Malaysia. Masters thesis, Universiti Putra Malaysia. Construction industry - Cost control English
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
language English
English
topic Construction industry - Cost control
spellingShingle Construction industry - Cost control
Lew, Yoke Lian
Cost Control Strategies For Ibs Contractors In Malaysia
description Industrialised Building System (IBS) is a system widely used in construction industry in Malaysia. This study is a survey to identify the factors contributing to cost control problems faced by local contractors in IBS projects and to identify the strategies used to reduce the cost variation in IBS projects. From the finding of the survey, a computer-based cost control model was developed to improve the effectiveness of cost control on IBS. The survey shows that management team capability & performance, buildability of design, and timely decision making were the top-ranked factors contributing to cost control problems in IBS construction in Malaysia. Strategies like increase the working hours, increase manpower and/or equipment, provide close supervision to subordinates for minimising abortive work, and coordinate closely with subcontractors were identified as the most popular method used to reduce cost variation of IBS projects. In hypotheses testing of this study, it was found that there is significant association between type of IBS used and the perceived contributor to cost control problems.Results of Logistic Regression Analysis shows that allowance of partially handover, delay of payment from client to the contractor, deposit needed for IBS before delivery of the precast components, and application of tracking curve for cost control are likely to influence the cost variance of IBS construction projects. The developed computer-based cost control model could assist constructor of IBS (with prefabricated elements) to plan their expenses and progress of work. Additionally, monitoring during the construction is made available through a series of user-friendly electronic forms. With identification of potential problem contributors, strategies to overcome cost variation, and application of the cost control model, cost control of IBS projects in Malaysia would be unproblematic to any new or existing IBS practitioners.
format Thesis
author Lew, Yoke Lian
author_facet Lew, Yoke Lian
author_sort Lew, Yoke Lian
title Cost Control Strategies For Ibs Contractors In Malaysia
title_short Cost Control Strategies For Ibs Contractors In Malaysia
title_full Cost Control Strategies For Ibs Contractors In Malaysia
title_fullStr Cost Control Strategies For Ibs Contractors In Malaysia
title_full_unstemmed Cost Control Strategies For Ibs Contractors In Malaysia
title_sort cost control strategies for ibs contractors in malaysia
publishDate 2002
url http://psasir.upm.edu.my/id/eprint/12077/1/FK_2002_42.pdf
http://psasir.upm.edu.my/id/eprint/12077/
_version_ 1803336784121167872
score 13.211869