Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit

This paper describes the failure assessment of the unloading arm unit that is connected to a Liquified Natural Gas (LNG) terminal. In this work, an external event, i.e., lightning, was simulated as the triggering event. A Temporal Fault Tree (TFT) analysis was developed, and sequential failures that...

Full description

Saved in:
Bibliographic Details
Main Authors: Dirik, Cengiz, Awang Biak, Dayang Radiah, Abdul Razak, Mus'ab, Nik Ibrahim, Nik Nor Liyana
Format: Article
Published: Elsevier 2022
Online Access:http://psasir.upm.edu.my/id/eprint/101441/
https://www.sciencedirect.com/science/article/pii/S0950423021003211
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.upm.eprints.101441
record_format eprints
spelling my.upm.eprints.1014412023-08-11T08:19:44Z http://psasir.upm.edu.my/id/eprint/101441/ Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit Dirik, Cengiz Awang Biak, Dayang Radiah Abdul Razak, Mus'ab Nik Ibrahim, Nik Nor Liyana This paper describes the failure assessment of the unloading arm unit that is connected to a Liquified Natural Gas (LNG) terminal. In this work, an external event, i.e., lightning, was simulated as the triggering event. A Temporal Fault Tree (TFT) analysis was developed, and sequential failures that function under the Priority AND (PAND) gate were assessed. The results show that the highest contributing factor to the failure of the terminal unloading arm was the sequential failure due to the loss of sensors which can happen before or after lightning strikes. The occurrence of failures for the loading arm was estimated using a Monte Carlo Simulation (MCS). For service years of 32.7, the sequential failures occurred 131 times when preventive maintenance was not considered. This work also presents that the failure distribution of the marine loading arm follows the Weibull distribution characteristic with the scale (α) and the shape (β) parameters values of 132,817.5 h-1 and 1.556, respectively. Elsevier 2022 Article PeerReviewed Dirik, Cengiz and Awang Biak, Dayang Radiah and Abdul Razak, Mus'ab and Nik Ibrahim, Nik Nor Liyana (2022) Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit. Journal of Loss Prevention in the Process Industries, 75. art. no. 104717. pp. 1-9. ISSN 0950-4230; ESSN: 1873-3352 https://www.sciencedirect.com/science/article/pii/S0950423021003211 10.1016/j.jlp.2021.104717
institution Universiti Putra Malaysia
building UPM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Putra Malaysia
content_source UPM Institutional Repository
url_provider http://psasir.upm.edu.my/
description This paper describes the failure assessment of the unloading arm unit that is connected to a Liquified Natural Gas (LNG) terminal. In this work, an external event, i.e., lightning, was simulated as the triggering event. A Temporal Fault Tree (TFT) analysis was developed, and sequential failures that function under the Priority AND (PAND) gate were assessed. The results show that the highest contributing factor to the failure of the terminal unloading arm was the sequential failure due to the loss of sensors which can happen before or after lightning strikes. The occurrence of failures for the loading arm was estimated using a Monte Carlo Simulation (MCS). For service years of 32.7, the sequential failures occurred 131 times when preventive maintenance was not considered. This work also presents that the failure distribution of the marine loading arm follows the Weibull distribution characteristic with the scale (α) and the shape (β) parameters values of 132,817.5 h-1 and 1.556, respectively.
format Article
author Dirik, Cengiz
Awang Biak, Dayang Radiah
Abdul Razak, Mus'ab
Nik Ibrahim, Nik Nor Liyana
spellingShingle Dirik, Cengiz
Awang Biak, Dayang Radiah
Abdul Razak, Mus'ab
Nik Ibrahim, Nik Nor Liyana
Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit
author_facet Dirik, Cengiz
Awang Biak, Dayang Radiah
Abdul Razak, Mus'ab
Nik Ibrahim, Nik Nor Liyana
author_sort Dirik, Cengiz
title Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit
title_short Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit
title_full Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit
title_fullStr Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit
title_full_unstemmed Externally initiated event in sequential risk assessment for the onshore LNG marine loading arm unit
title_sort externally initiated event in sequential risk assessment for the onshore lng marine loading arm unit
publisher Elsevier
publishDate 2022
url http://psasir.upm.edu.my/id/eprint/101441/
https://www.sciencedirect.com/science/article/pii/S0950423021003211
_version_ 1775624493915439104
score 13.211869