A simulation approach for dispatching techniques comparison in 200mm wafer foundry
This paper focuses on the comparison of the fundamental techniques for lot dispatching to reveal results for optimum product cycle time. The model is built, based on the 200mm-wafer size, 12K product Work In Progress (WIP), 10 product mixes in the current WIP with 2 new prototype product start daily...
Saved in:
Main Authors: | , , |
---|---|
Format: | |
Published: |
2017
|
Online Access: | http://dspace.uniten.edu.my:8080/jspui/handle/123456789/5326 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-5326 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-53262017-11-15T02:57:32Z A simulation approach for dispatching techniques comparison in 200mm wafer foundry Chik, M.A. Ahmad, I. Jamaluddin, Md.Y. This paper focuses on the comparison of the fundamental techniques for lot dispatching to reveal results for optimum product cycle time. The model is built, based on the 200mm-wafer size, 12K product Work In Progress (WIP), 10 product mixes in the current WIP with 2 new prototype product start daily, for 3K-wafer start per week (WSPW) capacity. The fundamental dispatching rules to be compared are includes First In First Out (FIFO), Shortest Processing Time (SPT), Critical Ratio (CR), Earliest due date (EDD), Shortest Remaining Processing Time (SRPT) and Random (RAN). In the comparison, a snap shot of WIP and product mix were taken at the wafer processing station from pad oxidation cleaning process to alloy. The result then is generated from the commercial simulation software, where requirements such as product cycle time, manufacturing efficiency, equipment availability, product yield and WIP profile are the inputs for the model. The results reveal that CR dispatching rule gives the shortest cycle time for a product to complete all the processes of wafer fabrication by 6% to 13% compared to the other five dispatching rules. Further analyzing for better cycle time, a combination of dispatching rule that consists of CR and SRPT has been tested and yielded 10% additional shorter cycle time compared to CR rule, which make overall improvement to maximum of 23% for overall finding. The result of these finding has been successfully accepted and realization in the real wafer fabrication operation. © 2004 IEEE. 2017-11-15T02:57:32Z 2017-11-15T02:57:32Z 2004 http://dspace.uniten.edu.my:8080/jspui/handle/123456789/5326 |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
This paper focuses on the comparison of the fundamental techniques for lot dispatching to reveal results for optimum product cycle time. The model is built, based on the 200mm-wafer size, 12K product Work In Progress (WIP), 10 product mixes in the current WIP with 2 new prototype product start daily, for 3K-wafer start per week (WSPW) capacity. The fundamental dispatching rules to be compared are includes First In First Out (FIFO), Shortest Processing Time (SPT), Critical Ratio (CR), Earliest due date (EDD), Shortest Remaining Processing Time (SRPT) and Random (RAN). In the comparison, a snap shot of WIP and product mix were taken at the wafer processing station from pad oxidation cleaning process to alloy. The result then is generated from the commercial simulation software, where requirements such as product cycle time, manufacturing efficiency, equipment availability, product yield and WIP profile are the inputs for the model. The results reveal that CR dispatching rule gives the shortest cycle time for a product to complete all the processes of wafer fabrication by 6% to 13% compared to the other five dispatching rules. Further analyzing for better cycle time, a combination of dispatching rule that consists of CR and SRPT has been tested and yielded 10% additional shorter cycle time compared to CR rule, which make overall improvement to maximum of 23% for overall finding. The result of these finding has been successfully accepted and realization in the real wafer fabrication operation. © 2004 IEEE. |
format |
|
author |
Chik, M.A. Ahmad, I. Jamaluddin, Md.Y. |
spellingShingle |
Chik, M.A. Ahmad, I. Jamaluddin, Md.Y. A simulation approach for dispatching techniques comparison in 200mm wafer foundry |
author_facet |
Chik, M.A. Ahmad, I. Jamaluddin, Md.Y. |
author_sort |
Chik, M.A. |
title |
A simulation approach for dispatching techniques comparison in 200mm wafer foundry |
title_short |
A simulation approach for dispatching techniques comparison in 200mm wafer foundry |
title_full |
A simulation approach for dispatching techniques comparison in 200mm wafer foundry |
title_fullStr |
A simulation approach for dispatching techniques comparison in 200mm wafer foundry |
title_full_unstemmed |
A simulation approach for dispatching techniques comparison in 200mm wafer foundry |
title_sort |
simulation approach for dispatching techniques comparison in 200mm wafer foundry |
publishDate |
2017 |
url |
http://dspace.uniten.edu.my:8080/jspui/handle/123456789/5326 |
_version_ |
1644493658303496192 |
score |
13.214268 |