Assessing dam spillway discharge capacity in response to extreme floods in Perak river hydroelectric scheme: Simulation and proposed mitigation measures
The aged dams in Perak river Hydro-Electric Scheme (HES) have been constructed decades ago and a common concern raised during dam safety reviews is that they were not designed to safely reroute the Probable Maximum Flood (PMF) but rather the Inflow Design Flood (IDF) of 1,000 years� design floods. F...
Saved in:
Main Authors: | Azha S.F., Sidek L.M., Kok K., Ahmad S.A., Saman D.H., Allias Omar S.M., Basri H., Zawawi M.H., Ahmed A.N. |
---|---|
Other Authors: | 56166798400 |
Format: | Article |
Published: |
Ain Shams University
2024
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Dam Break Analysis of Probable Maximum Flood (PMF) Failures in Cameron Highlands Batang-Padang Hydro-Electric Scheme
by: Sidek L.M., et al.
Published: (2024) -
Numerical modelling dam break analysis for water supply project
by: Lariyah M.S., et al.
Published: (2023) -
Determination of probability distribution for data on rainfalland flood levels in Bangladesh
by: Mohammad, Ferdows, Dr., et al.
Published: (2011) -
Probable maximum precipitation (PMP) over mountainous region of cameron highlands-batang padang catchment of Malaysia
by: Sidek L.M., et al.
Published: (2023) -
Adaptive settlements toward flooding in the riverbanks of Meureudu Rriver Indonesia / Mirza Irwansyah, Cut Nursaniah and Laila Qadri
by: Irwansyah, Mirza, et al.
Published: (2018)