Development of load carrier robot

TJ211.M83 2015

Saved in:
Bibliographic Details
Main Author: Muhammad Junaidi bin Ismail
Format: text::Final Year Project
Language:English
Published: 2024
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-33804
record_format dspace
spelling my.uniten.dspace-338042024-10-13T02:02:45Z Development of load carrier robot Muhammad Junaidi bin Ismail Robots-Control system TJ211.M83 2015 The development of robots becomes popular among inventors nowadays. Almost of the robot built is mobile robot. However, there are many problem faced by the mobile robot. The main problem faced by the wheeled robot is the accessibility. Wheeled robots are actually suitable in at flat surface but their usage is almost impractical in rugged terrain. Furthermore the use of legged robot is become more popular and gaining popularity in industry. The technology for building walking robot is can be implemented to build the assistance for handicapped, exploration to mars and others. The project is concern about the design and construction of six legged walking robot. This six legged robot is actually different in term of its movement because it based on the spider movement. This robot is expecting to move forward and tilt to right on the flat surface with six legged. The project involving the hardware design and circuitry design. The actuators of the robot consist of three Tower Pro servo motor. The two servo motor has the same degree of freedom while the other one is actually actuated to shift the central gravity of the robot for balancing purpose when walking. The robot is controlled by Picaxe 20m2 microcontroller which acts as the brain of the robot. The Picaxe 20m2 implement the programmed walking gaits of the robot. The robot walking gaits is programmed in Bas language and loaded into the microcontroller using software tools like Picaxe Programming Editor. The main material of the robot is Perspex because of its strength, flexibility and even light. The power supply of the robot is supplied via cable from power supply. The reason is the six leg waking robot needs high current to actuate. 2024-10-10T03:17:47Z 2024-10-10T03:17:47Z 2015 Resource Types::text::Final Year Project https://irepository.uniten.edu.my/handle/123456789/33804 en application/pdf
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
language English
topic Robots-Control system
spellingShingle Robots-Control system
Muhammad Junaidi bin Ismail
Development of load carrier robot
description TJ211.M83 2015
format Resource Types::text::Final Year Project
author Muhammad Junaidi bin Ismail
author_facet Muhammad Junaidi bin Ismail
author_sort Muhammad Junaidi bin Ismail
title Development of load carrier robot
title_short Development of load carrier robot
title_full Development of load carrier robot
title_fullStr Development of load carrier robot
title_full_unstemmed Development of load carrier robot
title_sort development of load carrier robot
publishDate 2024
_version_ 1814061089883684864
score 13.222552