Application of pmbok standard to manage construction delay problem in high voltage power cable laying project in Sepang, Selangor
TK3351.M83 2015
Saved in:
Main Author: | Muhammad Haziq Bin Mohamad Ali |
---|---|
Format: | text::Final Year Project |
Language: | English |
Published: |
2024
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Condition monitoring of power cables
by: Mohd Raffi, Samsudin, Ir., et al.
Published: (2013) -
Analysis of time domain reflectometry parameters for XLPE cable diagnostics
by: Nur Arina Awang
Published: (2024) -
Combination of ultrasonic signal with wavelet analysis for detection of cable degradation / Mohammed Suhaimi Wasi Zainal Ariffin
by: Zainal Ariffin, Mohammed Suhaimi Wasi
Published: (2013) -
Analysis of high frequency wave propagation characteristics in medium voltage XLPE cable model
by: Thayoob Y.H.M., et al.
Published: (2023) -
Modelling and simulation of scattering parameter model for cable joint in a cable system
by: Mohd Amjad Ridzuan bin Radhi
Published: (2023)