The performance study of IBS and conventional method for school construction project
TA168.N87 2015
Saved in:
Main Author: | Nurfarrah Syahiera Abdul Halim |
---|---|
Format: | text::Final Year Project |
Language: | English |
Published: |
2024
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Does IBS implementation affect the construction cost / Muhammad Syahir Soleh
by: Soleh, Muhammad Syahir
Published: (2021) -
Comparison study on conventional system identification techniques
by: Norfadli Bin Abdul Latif
Published: (2023) -
The awareness of BCA implementation among government school in Selangor / Shasharina Mohammad
by: Mohammad, Shasharina
Published: (2014) -
The Industrialized Building System (IBS) as an alternative to the conventional construction method / Nurul Fatin Idayu Azman
by: Azman, Nurul Fatin Idayu
Published: (2021) -
Factors contributing to progress payment problems in Malaysian construction projects / Nurul Izzati Abdul Halim and Nor Suzila Lop
by: Abdul Halim, Nurul Izzati, et al.
Published: (2023)