Improving capacity and line performance on connecting rod line through the lean production system

HD58.9.S92 2018

Saved in:
Bibliographic Details
Main Author: Syafiqah Hazmi
Format: text::Final Year Project
Language:English
Published: 2024
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-31762
record_format dspace
spelling my.uniten.dspace-317622024-04-07T02:00:49Z Improving capacity and line performance on connecting rod line through the lean production system Syafiqah Hazmi Lean manufacturing HD58.9.S92 2018 This research basically focusing on finding the improvement ideas on the capacity and line performance problem at connecting rod line. The capacity of connecting rod related to the defects of connecting rod part that occurred during the production time. The line performance can be measured by analysing the downtime and the reason behind the downtime occurred during the production day. Based on the data collection, the main focus area for this research is on the Press Bush machine which is one of the operational process that contributes capacity and line performance problem at the connecting rod line. The observation is conducted on the production line for two weeks' time duration. The 4M elements are considered during the observation. The 4M elements are Man, Machine, Materials and Method. The data analysis and results are carried out based on the observation result. The result shows that the Man elements contribute more portion in the capacity and line performance problem. Suggested solution for the company are listed out from the knowledge gain from manufacturing lectures and journal reading suitable based on the case study. 2024-04-01T06:41:25Z 2024-04-01T06:41:25Z 2018 Resource Types::text::Final Year Project https://irepository.uniten.edu.my/handle/123456789/31762 en application/pdf
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
language English
topic Lean manufacturing
spellingShingle Lean manufacturing
Syafiqah Hazmi
Improving capacity and line performance on connecting rod line through the lean production system
description HD58.9.S92 2018
format Resource Types::text::Final Year Project
author Syafiqah Hazmi
author_facet Syafiqah Hazmi
author_sort Syafiqah Hazmi
title Improving capacity and line performance on connecting rod line through the lean production system
title_short Improving capacity and line performance on connecting rod line through the lean production system
title_full Improving capacity and line performance on connecting rod line through the lean production system
title_fullStr Improving capacity and line performance on connecting rod line through the lean production system
title_full_unstemmed Improving capacity and line performance on connecting rod line through the lean production system
title_sort improving capacity and line performance on connecting rod line through the lean production system
publishDate 2024
_version_ 1806425580195807232
score 13.214268