Self-scheduling of wind power generation with direct load control demand response as a virtual power plant
A virtual power plant, VPP, defined as a collection of dispersed generator units, storages and controllable load systems aggregated as a unique power plant. VPPs were categorized as Commercial virtual power plant, CVPP and Technical virtual power plant, TVPP. CVPP was related to the market and expec...
Saved in:
Main Authors: | Tahmasebi M., Pasupuleti J. |
---|---|
Other Authors: | 55945605900 |
Format: | Article |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Next generation wind and solar power From cost to value
by: International Energy Agency
Published: (2020) -
Wind power in power systems
by: Ackermann, Thomas.
Published: (2012) -
Priority-based vehicle-to-grid scheduling for minimization of power grid load variance
by: Mohd Syahmi Hashim, Mr.
Published: (2023) -
Small scale wind power generation
by: Richard, Wong Chung Hie
Published: (2015) -
Study on wind speed correlation for roof mounted wind turbine energy yield estimation
by: Osea Tuinivanua Vola
Published: (2023)