Reliability and availability study on substation automation system based on IEC 61850
The introduction of IEC61850 standards for substation automation requires the specification of the reliability and availability performance parameter. Presently, the methodology to calculate and verify the parameters is not readily available. This paper proposed a methodology to calculate the parame...
Saved in:
Main Authors: | , , , , |
---|---|
其他作者: | |
格式: | Conference paper |
出版: |
2023
|
主題: | |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|