Reliability and availability study on substation automation system based on IEC 61850

The introduction of IEC61850 standards for substation automation requires the specification of the reliability and availability performance parameter. Presently, the methodology to calculate and verify the parameters is not readily available. This paper proposed a methodology to calculate the parame...

全面介绍

Saved in:
书目详细资料
Main Authors: Yunus B., Musa A., Ong H.S., Khalid A.R., Hashim H.
其他作者: 24448917500
格式: Conference paper
出版: 2023
主题:
标签: 添加标签
没有标签, 成为第一个标记此记录!