Cadangan merekebentuk, membina dan menyiapkan kompleks UNITEN TNB fasa kedua di atas lot 559, sebahagian lot 1054 dan di sebahagian lot 1413 Mukim Dengkil, daerah Sepang, Selangor
Saved in:
Main Author: | Universiti Tenaga Nasional |
---|---|
Format: | text::Uniten Press |
Published: |
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
SEBAHAGIAN
by: Kosmo, ,
Published: (2013) -
Daya tahan komuniti terhadap bencana banjir di Mukim Dengkil, Sepang
by: Raja Noor Afiz Raja Noor Afandi,, et al.
Published: (2023) -
Kerjasama universiti, industri sebahagian KPI
by: Irwan Shafrizan, Ismail
Published: (2010) -
Setiap Pertuturan Sebahagian Daripada Akhlak
by: Harian Metro
Published: (2014) -
Politik sebahagian daripada latihan akademik
by: Berita Harian, Malaysia
Published: (1988)