Independent source solution for backup system in main intake substation
This research project propose an independent power solution by using hybrid renewable energy system to supply Tenaga Nasional Berhad (TNB) Main Intake Substation (PMU) building located in remote areas. In these areas, limited numbers of PMU can be built due to unre;iability and insecurity of electri...
Saved in:
Main Author: | |
---|---|
Format: | text::Final Year Project |
Language: | English |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-27630 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-276302023-07-23T02:04:18Z Independent source solution for backup system in main intake substation Cheong Serene Emergency power supply Electric power system - Load dispatching This research project propose an independent power solution by using hybrid renewable energy system to supply Tenaga Nasional Berhad (TNB) Main Intake Substation (PMU) building located in remote areas. In these areas, limited numbers of PMU can be built due to unre;iability and insecurity of electrical supply into the building. 2023-07-17T09:28:48Z 2023-07-17T09:28:48Z 2018 Resource Types::text::Final Year Project https://irepository.uniten.edu.my/handle/123456789/27630 en application/pdf |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
language |
English |
topic |
Emergency power supply Electric power system - Load dispatching |
spellingShingle |
Emergency power supply Electric power system - Load dispatching Cheong Serene Independent source solution for backup system in main intake substation |
description |
This research project propose an independent power solution by using hybrid renewable energy system to supply Tenaga Nasional Berhad (TNB) Main Intake Substation (PMU) building located in remote areas. In these areas, limited numbers of PMU can be built due to unre;iability and insecurity of electrical supply into the building. |
format |
Resource Types::text::Final Year Project |
author |
Cheong Serene |
author_facet |
Cheong Serene |
author_sort |
Cheong Serene |
title |
Independent source solution for backup system in main intake substation |
title_short |
Independent source solution for backup system in main intake substation |
title_full |
Independent source solution for backup system in main intake substation |
title_fullStr |
Independent source solution for backup system in main intake substation |
title_full_unstemmed |
Independent source solution for backup system in main intake substation |
title_sort |
independent source solution for backup system in main intake substation |
publishDate |
2023 |
_version_ |
1806427301472108544 |
score |
13.222552 |