Independent source solution for backup system in main intake substation

This research project propose an independent power solution by using hybrid renewable energy system to supply Tenaga Nasional Berhad (TNB) Main Intake Substation (PMU) building located in remote areas. In these areas, limited numbers of PMU can be built due to unre;iability and insecurity of electri...

Full description

Saved in:
Bibliographic Details
Main Author: Cheong Serene
Format: text::Final Year Project
Language:English
Published: 2023
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-27630
record_format dspace
spelling my.uniten.dspace-276302023-07-23T02:04:18Z Independent source solution for backup system in main intake substation Cheong Serene Emergency power supply Electric power system - Load dispatching This research project propose an independent power solution by using hybrid renewable energy system to supply Tenaga Nasional Berhad (TNB) Main Intake Substation (PMU) building located in remote areas. In these areas, limited numbers of PMU can be built due to unre;iability and insecurity of electrical supply into the building. 2023-07-17T09:28:48Z 2023-07-17T09:28:48Z 2018 Resource Types::text::Final Year Project https://irepository.uniten.edu.my/handle/123456789/27630 en application/pdf
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
language English
topic Emergency power supply
Electric power system - Load dispatching
spellingShingle Emergency power supply
Electric power system - Load dispatching
Cheong Serene
Independent source solution for backup system in main intake substation
description This research project propose an independent power solution by using hybrid renewable energy system to supply Tenaga Nasional Berhad (TNB) Main Intake Substation (PMU) building located in remote areas. In these areas, limited numbers of PMU can be built due to unre;iability and insecurity of electrical supply into the building.
format Resource Types::text::Final Year Project
author Cheong Serene
author_facet Cheong Serene
author_sort Cheong Serene
title Independent source solution for backup system in main intake substation
title_short Independent source solution for backup system in main intake substation
title_full Independent source solution for backup system in main intake substation
title_fullStr Independent source solution for backup system in main intake substation
title_full_unstemmed Independent source solution for backup system in main intake substation
title_sort independent source solution for backup system in main intake substation
publishDate 2023
_version_ 1806427301472108544
score 13.222552