Real time control using scada RTU in a water management and simulating the oxidation ditch of a sewage treatment plant in a Matlab/Simulink environment
The need for control of the influent load to a wastewater treatment plant (WWTP) is becoming more important.
Saved in:
Main Author: | |
---|---|
Format: | text::Final Year Project |
Language: | English US |
Published: |
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | The need for control of the influent load to a wastewater treatment plant (WWTP) is becoming more important. |
---|