Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)

Delay is a critical and common issues to the contractor, consultant or client in every construction project from all over the world. Negative impacts from the construction delay can affect the organization itself. In this era, rail transportation is one of the famous transportations in Malaysia apar...

Full description

Saved in:
Bibliographic Details
Main Authors: Ramli M.Z., Abidin M.Z.Z., Hamid N.B., Razman R., Noh N.A.M.
Other Authors: 57195984780
Format: Conference Paper
Published: American Institute of Physics Inc. 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-26213
record_format dspace
spelling my.uniten.dspace-262132023-05-29T17:07:51Z Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII) Ramli M.Z. Abidin M.Z.Z. Hamid N.B. Razman R. Noh N.A.M. 57195984780 57222540139 57190252816 57191868634 57223338227 Delay is a critical and common issues to the contractor, consultant or client in every construction project from all over the world. Negative impacts from the construction delay can affect the organization itself. In this era, rail transportation is one of the famous transportations in Malaysia apart from the road transportation and air transportation. Railway construction is one of the constructions which is active in Malaysia. Basically, when the railway construction project faced the delay matter, the organization will encounter the cost overrun and time overrun. From the previous studies, there are many researchers mentioned about the causes and impacts of the railway construction in Malaysia. However, the investigation has not been extensively studied to reduce this phenomenon. In this study, the delay factors involved for railway projects in Malaysia has been determined and ranked. The questionnaire was distributed to 30 experts for validation of the delay factors obtained from literature. The questionnaire survey was divided into 3 sections which the first section was demographic question, second section was the delay factors and lastly the impact of the delay. Meanwhile, the second level of questionnaire was distributed to 118 respondents who are involved in railway construction project. There were fifty-seven delay factors extracted from previous studies with a total of seven groups. To rank these delay factors, Relative Important Index (RII) method was used based on the first and second level of questionnaire data. Thus, at the end of this study, the most significant delay factors from first level questionnaire data are (1) political scenario; (2) mistakes / discrepancies in contract documents; (3) shortage of materials; (4) design changes and (5) financial problems. From the second level of questionnaire data, the most significant delay factors are (1) delay in material procurement; (2) low quality of materials; (3) unforeseen ground condition; (4) accident/safety and health issues during construction; and (5) delay payment to sub-contractor. � 2021 American Institute of Physics Inc.. All rights reserved. Final 2023-05-29T09:07:50Z 2023-05-29T09:07:50Z 2021 Conference Paper 10.1063/5.0050178 2-s2.0-85105624201 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85105624201&doi=10.1063%2f5.0050178&partnerID=40&md5=b955d1163a78d7e8c18ea6a366ca7e18 https://irepository.uniten.edu.my/handle/123456789/26213 2339 20114 American Institute of Physics Inc. Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Delay is a critical and common issues to the contractor, consultant or client in every construction project from all over the world. Negative impacts from the construction delay can affect the organization itself. In this era, rail transportation is one of the famous transportations in Malaysia apart from the road transportation and air transportation. Railway construction is one of the constructions which is active in Malaysia. Basically, when the railway construction project faced the delay matter, the organization will encounter the cost overrun and time overrun. From the previous studies, there are many researchers mentioned about the causes and impacts of the railway construction in Malaysia. However, the investigation has not been extensively studied to reduce this phenomenon. In this study, the delay factors involved for railway projects in Malaysia has been determined and ranked. The questionnaire was distributed to 30 experts for validation of the delay factors obtained from literature. The questionnaire survey was divided into 3 sections which the first section was demographic question, second section was the delay factors and lastly the impact of the delay. Meanwhile, the second level of questionnaire was distributed to 118 respondents who are involved in railway construction project. There were fifty-seven delay factors extracted from previous studies with a total of seven groups. To rank these delay factors, Relative Important Index (RII) method was used based on the first and second level of questionnaire data. Thus, at the end of this study, the most significant delay factors from first level questionnaire data are (1) political scenario; (2) mistakes / discrepancies in contract documents; (3) shortage of materials; (4) design changes and (5) financial problems. From the second level of questionnaire data, the most significant delay factors are (1) delay in material procurement; (2) low quality of materials; (3) unforeseen ground condition; (4) accident/safety and health issues during construction; and (5) delay payment to sub-contractor. � 2021 American Institute of Physics Inc.. All rights reserved.
author2 57195984780
author_facet 57195984780
Ramli M.Z.
Abidin M.Z.Z.
Hamid N.B.
Razman R.
Noh N.A.M.
format Conference Paper
author Ramli M.Z.
Abidin M.Z.Z.
Hamid N.B.
Razman R.
Noh N.A.M.
spellingShingle Ramli M.Z.
Abidin M.Z.Z.
Hamid N.B.
Razman R.
Noh N.A.M.
Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)
author_sort Ramli M.Z.
title Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)
title_short Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)
title_full Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)
title_fullStr Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)
title_full_unstemmed Ranking of railway construction project delay factors in Malaysia by using relative importance index (RII)
title_sort ranking of railway construction project delay factors in malaysia by using relative importance index (rii)
publisher American Institute of Physics Inc.
publishDate 2023
_version_ 1806424040715321344
score 13.214268