Issues and challenges in voltage uprating for sustainable power operation: A case study of a 132 kv transmission line system in malaysia
demand-side management; electrical power; electricity supply; exploration; forest cover; infrastructure planning; transportation development; Malaysia
Saved in:
Main Authors: | Nor S.F.M., Ab Kadir M.Z.A., Ariffin A.M., Osman M., Rahman M.S.A., Zainuddin N.M. |
---|---|
Other Authors: | 57188964617 |
Format: | Article |
Published: |
MDPI
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Systematic approaches and analyses on voltage uprating of 132 kv transmission lines: A case study in malaysia
by: Nor S.F.M., et al.
Published: (2023) -
Issues and challenges in voltage uprating for sustainable power operation: a case study of a 132 kV transmission line system in Malaysia
by: Mohd Nor, Shamsul Fahmi, et al.
Published: (2021) -
Systematic approaches and analyses on voltage uprating of 132 kV transmission lines: a case study in Malaysia
by: Mohd Nor, Shamsul Fahmi, et al.
Published: (2021) -
Voltage uprating of existing 275kV overhead transmission line tower for increasing the power transfer capability
by: Mat Yamin, Mohd Khairuddin
Published: (2012) -
Lightning impulse strength of 275 kV and 132 kV tower with composite crossarm
by: Abd Rahman, M.S., et al.
Published: (2020)