PMP Driven Probable Maximum Flood for 4 Dams in Sungai Perak Hydroelectric Scheme
Probable Maximum Flood is considered as one of the most applied inflow design floods in the determination of dam structure adequacy in current practices. This study revised the inflow design flood values for Sungai Perak Hydroelectric Scheme using Probable Maximum Flood estimation. Probable Maximum...
Saved in:
Main Authors: | Razali J., Mohd Sidek L., Marufuzzaman M., Rakhecha P.R., M Radzi M.R., Hossain M.S., Zawawi M.H. |
---|---|
Other Authors: | 42862303000 |
Format: | Book Chapter |
Published: |
Springer
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Probable Maximum Precipitation (PMP) Analysis for Bakun Dam Area
by: Yiau, S.S., et al.
Published: (2011) -
Probable maximum precipitation (PMP) over mountainous region of cameron highlands-batang padang catchment of Malaysia
by: Sidek L.M., et al.
Published: (2023) -
Dam Break Modelling and Flood Hazard Mapping for Cascading Dams in Sungai Perak Hydroelectric Scheme
by: Mohd Sidek L., et al.
Published: (2023) -
Estimation of Probable Maximum Precipitation (PMP) in Manek Urai, Kelantan
by: Musa, Nadzirah
Published: (2015) -
Probable Maximum Precipitation comparison using hershfield's statistical method and hydro-meteorological method for Sungai Perak Hydroelectric Scheme
by: Razali J., et al.
Published: (2023)