Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor

There are 104 dams in Malaysia for various functions and some of these dams have been built for more than 50 years ago. Among them, about 41 dams are classified as high-risk dams. Although, there are no dam failure cases in Malaysia reported dam failures to continue to occur worldwide and it is acce...

Full description

Saved in:
Bibliographic Details
Main Authors: Said N.F.M., Mohd Sidek L., Mustafa Z., Mansor F.H., Jamal M.B.
Other Authors: 57189243019
Format: Book Chapter
Published: Springer 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-25808
record_format dspace
spelling my.uniten.dspace-258082023-05-29T16:14:38Z Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor Said N.F.M. Mohd Sidek L. Mustafa Z. Mansor F.H. Jamal M.B. 57189243019 35070506500 57212460588 55812571300 57212466599 There are 104 dams in Malaysia for various functions and some of these dams have been built for more than 50 years ago. Among them, about 41 dams are classified as high-risk dams. Although, there are no dam failure cases in Malaysia reported dam failures to continue to occur worldwide and it is accepted a practice that dams must have an Emergency Action Plan (EAP) for management of disasters. An Emergency Action Plan, or EAP, is a formal plan that identifies potential emergency conditions at a dam and prescribes the procedures to be followed to minimize property damage and loss of life. As a dam owner responsibility, Badan Kawal Selia Air Negeri Johor (BAKAJ) initiated to develop EAP for Juaseh Dam in Johor, owned by the BAKAJ and operated by Syarikat Air Johor (SAJ). An emergency in terms of dam operation is defined as a condition, which develops unexpectedly, endangers the structural integrity of the dam and/or downstream property and human life and requires an immediate response. Developing an effective EAP requires communication and coordination between various groups including agencies and the local community. This paper presented the procedure of EAP preparation and components of EAP. The purpose and notification flowchart that summarizes the emergencies considered with the person in charge is included in this paper. In addition, the guideline of roles and responsibilities of the dam personnel, procedures for the timely and reliable identification, evaluation and classification of existing or potential emergency conditions, communication procedures, inundation maps and preventive action to prepare for any emergency is described in this research. � 2020, Springer Nature Singapore Pte Ltd. Final 2023-05-29T08:14:38Z 2023-05-29T08:14:38Z 2020 Book Chapter 10.1007/978-981-15-1971-0_11 2-s2.0-85076775783 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85076775783&doi=10.1007%2f978-981-15-1971-0_11&partnerID=40&md5=d4268e0e7147722fc5c9de005e66b852 https://irepository.uniten.edu.my/handle/123456789/25808 115 124 Springer Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description There are 104 dams in Malaysia for various functions and some of these dams have been built for more than 50 years ago. Among them, about 41 dams are classified as high-risk dams. Although, there are no dam failure cases in Malaysia reported dam failures to continue to occur worldwide and it is accepted a practice that dams must have an Emergency Action Plan (EAP) for management of disasters. An Emergency Action Plan, or EAP, is a formal plan that identifies potential emergency conditions at a dam and prescribes the procedures to be followed to minimize property damage and loss of life. As a dam owner responsibility, Badan Kawal Selia Air Negeri Johor (BAKAJ) initiated to develop EAP for Juaseh Dam in Johor, owned by the BAKAJ and operated by Syarikat Air Johor (SAJ). An emergency in terms of dam operation is defined as a condition, which develops unexpectedly, endangers the structural integrity of the dam and/or downstream property and human life and requires an immediate response. Developing an effective EAP requires communication and coordination between various groups including agencies and the local community. This paper presented the procedure of EAP preparation and components of EAP. The purpose and notification flowchart that summarizes the emergencies considered with the person in charge is included in this paper. In addition, the guideline of roles and responsibilities of the dam personnel, procedures for the timely and reliable identification, evaluation and classification of existing or potential emergency conditions, communication procedures, inundation maps and preventive action to prepare for any emergency is described in this research. � 2020, Springer Nature Singapore Pte Ltd.
author2 57189243019
author_facet 57189243019
Said N.F.M.
Mohd Sidek L.
Mustafa Z.
Mansor F.H.
Jamal M.B.
format Book Chapter
author Said N.F.M.
Mohd Sidek L.
Mustafa Z.
Mansor F.H.
Jamal M.B.
spellingShingle Said N.F.M.
Mohd Sidek L.
Mustafa Z.
Mansor F.H.
Jamal M.B.
Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor
author_sort Said N.F.M.
title Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor
title_short Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor
title_full Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor
title_fullStr Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor
title_full_unstemmed Emergency Action Plan for Public Safety Around the Juaseh Dam, Johor
title_sort emergency action plan for public safety around the juaseh dam, johor
publisher Springer
publishDate 2023
_version_ 1806425594614775808
score 13.222552