The barriers of the implementation of lean construction in Klang Valley, Malaysia
The traditional procurement system, the structure of the industry and the nature of the construction product all influence current practices and thinking within the construction industry. Whilst there have been recent changes in the way the industry operates, the majority of construction projects in...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Conference Paper |
Published: |
IOP Publishing Ltd
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-25066 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-250662023-05-29T16:06:38Z The barriers of the implementation of lean construction in Klang Valley, Malaysia Ahmed M.E.A. Wong L.S. 57204810357 55504782500 The traditional procurement system, the structure of the industry and the nature of the construction product all influence current practices and thinking within the construction industry. Whilst there have been recent changes in the way the industry operates, the majority of construction projects in Klang Valley are still delivered using traditional practices. The objective of this paper is to evaluate the influence factors of the implementation lean construction at selected construction sites in Klang Valley, Malaysia. Evaluation index system in terms of questionnaire and interview were utilized to evaluate the barriers of the implementation of lean construction. Based on that, questionnaire was selected with workers to evaluate the implementation of lean construction techniques in Klang Valley. After that, interview was selected to study the influence factors on the implementation of lean construction. Structural Equation Modelling was utilized in the survey with the project team (contractors, clients and consultants) to measure the effectiveness of the barriers and strategies of the implementation of lean construction at the construction sites. Based on that, the strategies of the implementation of lean construction can be described as follows. Provide support from the top management, develop strategic alliance between various firms, A requirement of staff competent to lean construction, develop the integration between design and construction, educate people about lean construction, encourage clients to adopt lean construction, provide staff training about lean construction as well as disputes and claims. In addition, their standardized estimates (SE) are (� = 0. 013, 0.025, 0.023, 0.027, 0.015, 0.034, 0.021, 0.021, 0.023 respectively. � Published under licence by IOP Publishing Ltd. Final 2023-05-29T08:06:38Z 2023-05-29T08:06:38Z 2020 Conference Paper 10.1088/1757-899X/932/1/012043 2-s2.0-85098509893 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85098509893&doi=10.1088%2f1757-899X%2f932%2f1%2f012043&partnerID=40&md5=b1d391c252271a154f02f259f61f9f88 https://irepository.uniten.edu.my/handle/123456789/25066 932 1 12043 All Open Access, Bronze IOP Publishing Ltd Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
The traditional procurement system, the structure of the industry and the nature of the construction product all influence current practices and thinking within the construction industry. Whilst there have been recent changes in the way the industry operates, the majority of construction projects in Klang Valley are still delivered using traditional practices. The objective of this paper is to evaluate the influence factors of the implementation lean construction at selected construction sites in Klang Valley, Malaysia. Evaluation index system in terms of questionnaire and interview were utilized to evaluate the barriers of the implementation of lean construction. Based on that, questionnaire was selected with workers to evaluate the implementation of lean construction techniques in Klang Valley. After that, interview was selected to study the influence factors on the implementation of lean construction. Structural Equation Modelling was utilized in the survey with the project team (contractors, clients and consultants) to measure the effectiveness of the barriers and strategies of the implementation of lean construction at the construction sites. Based on that, the strategies of the implementation of lean construction can be described as follows. Provide support from the top management, develop strategic alliance between various firms, A requirement of staff competent to lean construction, develop the integration between design and construction, educate people about lean construction, encourage clients to adopt lean construction, provide staff training about lean construction as well as disputes and claims. In addition, their standardized estimates (SE) are (� = 0. 013, 0.025, 0.023, 0.027, 0.015, 0.034, 0.021, 0.021, 0.023 respectively. � Published under licence by IOP Publishing Ltd. |
author2 |
57204810357 |
author_facet |
57204810357 Ahmed M.E.A. Wong L.S. |
format |
Conference Paper |
author |
Ahmed M.E.A. Wong L.S. |
spellingShingle |
Ahmed M.E.A. Wong L.S. The barriers of the implementation of lean construction in Klang Valley, Malaysia |
author_sort |
Ahmed M.E.A. |
title |
The barriers of the implementation of lean construction in Klang Valley, Malaysia |
title_short |
The barriers of the implementation of lean construction in Klang Valley, Malaysia |
title_full |
The barriers of the implementation of lean construction in Klang Valley, Malaysia |
title_fullStr |
The barriers of the implementation of lean construction in Klang Valley, Malaysia |
title_full_unstemmed |
The barriers of the implementation of lean construction in Klang Valley, Malaysia |
title_sort |
barriers of the implementation of lean construction in klang valley, malaysia |
publisher |
IOP Publishing Ltd |
publishDate |
2023 |
_version_ |
1806426659616718848 |
score |
13.214268 |