Causes of delay in construction of highway projects: A review

Construction is an essential process for all of the developing countries. Moreover, highway and infrastructure construction projects are rigid development in a country. Delay is a common phenomenon in the construction industry which directly impacts the cost and quality of the project. Delays can on...

Full description

Saved in:
Bibliographic Details
Main Authors: Karunakaran S., Malek M.A., Ramli M.Z.
Other Authors: 57204943131
Format: Article
Published: IAEME Publication 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-24797
record_format dspace
spelling my.uniten.dspace-247972023-05-29T15:27:13Z Causes of delay in construction of highway projects: A review Karunakaran S. Malek M.A. Ramli M.Z. 57204943131 55636320055 57195984780 Construction is an essential process for all of the developing countries. Moreover, highway and infrastructure construction projects are rigid development in a country. Delay is a common phenomenon in the construction industry which directly impacts the cost and quality of the project. Delays can only be reduced when the causes and its influences are identified and analyzed. In the past, most researchers have been working on finding the causes of delay in the construction project through several method and analysis. Nevertheless, the study on the delay causes and its influences towards the infrastructure and highway construction project is still limited and require more precise attention on it. The main objective of the study is to find the significant factors causes delay in the construction project especially in highway and road construction projects. Thus, the review methodology based on the frequency of occurrences of the factors causes delay in the highway and road construction project were significantly analyzed. This paper contributes a deep review on the factors that cause delay in the construction industry especially in the construction of highway and road projects. The top most significant factor causes delay in construction project was poor project planning and scheduling with the highest frequency of occurrences and percentage value which is 25 and 2.5% respectively. Therefore, this findings will be useful for future planning and time management in order to minimize the delay occurrences on the highway and road construction projects. � IAEME Publication. Final 2023-05-29T07:27:13Z 2023-05-29T07:27:13Z 2019 Article 2-s2.0-85066222147 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85066222147&partnerID=40&md5=1ddf9339c307c8cd2a692d4aace78e15 https://irepository.uniten.edu.my/handle/123456789/24797 10 2 2374 2386 IAEME Publication Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Construction is an essential process for all of the developing countries. Moreover, highway and infrastructure construction projects are rigid development in a country. Delay is a common phenomenon in the construction industry which directly impacts the cost and quality of the project. Delays can only be reduced when the causes and its influences are identified and analyzed. In the past, most researchers have been working on finding the causes of delay in the construction project through several method and analysis. Nevertheless, the study on the delay causes and its influences towards the infrastructure and highway construction project is still limited and require more precise attention on it. The main objective of the study is to find the significant factors causes delay in the construction project especially in highway and road construction projects. Thus, the review methodology based on the frequency of occurrences of the factors causes delay in the highway and road construction project were significantly analyzed. This paper contributes a deep review on the factors that cause delay in the construction industry especially in the construction of highway and road projects. The top most significant factor causes delay in construction project was poor project planning and scheduling with the highest frequency of occurrences and percentage value which is 25 and 2.5% respectively. Therefore, this findings will be useful for future planning and time management in order to minimize the delay occurrences on the highway and road construction projects. � IAEME Publication.
author2 57204943131
author_facet 57204943131
Karunakaran S.
Malek M.A.
Ramli M.Z.
format Article
author Karunakaran S.
Malek M.A.
Ramli M.Z.
spellingShingle Karunakaran S.
Malek M.A.
Ramli M.Z.
Causes of delay in construction of highway projects: A review
author_sort Karunakaran S.
title Causes of delay in construction of highway projects: A review
title_short Causes of delay in construction of highway projects: A review
title_full Causes of delay in construction of highway projects: A review
title_fullStr Causes of delay in construction of highway projects: A review
title_full_unstemmed Causes of delay in construction of highway projects: A review
title_sort causes of delay in construction of highway projects: a review
publisher IAEME Publication
publishDate 2023
_version_ 1806428436274610176
score 13.214268