Causes of construction delay for housing projects in Malaysia
Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situation that contractor, client, or consultant might face. Construction delay can bring bad impacts to th...
Saved in:
Main Authors: | , , , , , |
---|---|
Other Authors: | |
Format: | Conference Paper |
Published: |
American Institute of Physics Inc.
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-24566 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-245662023-05-29T15:24:38Z Causes of construction delay for housing projects in Malaysia Ramli M.Z. Nordin A. Roslin N.T. Hamid N.B. Azman N.S. Zahari N.M. 57195984780 57210393683 57205232728 57190252816 57204943050 54891672300 Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situation that contractor, client, or consultant might face. Construction delay can bring bad impacts to the organization itself or the overall development of a nation. From the previous studies, there are many researchers mentioned about the causes and impacts of the construction in Malaysia. However, little effort has been made to reduce this phenomenon in housing projects. Therefore, this research is to determine the delay factors involved in housing projects and rank the delay factors and delay impacts for housing projects. The qualitative method has been used to collect the data by distributing the questionnaire survey which contains 3 sections, the first section was demographic questions, the second section was the delay factors and lastly the delay impacts. The questionnaire was distributed to 30 experts to validate the delay factors that was obtained from the literature reviews and the second stage was targeted to 151 respondents who are involved in the construction industry. Total of sixty-three delay factors were identified with a total of eight groups meanwhile, the impact of delays in construction determined were twelve. Relative Importance Index (RII) method was used to rank those delay factors and impacts. The outcome of the study highlighted the most significant delay factors which are;(1) weather condition; (2) shortage in skilled laborers due to remoteness of site location; (3) progress payment delay by client; (4) award project to lowest bid price and (5) political interference. � 2019 Author(s). Final 2023-05-29T07:24:38Z 2023-05-29T07:24:38Z 2019 Conference Paper 10.1063/1.5118038 2-s2.0-85070543691 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85070543691&doi=10.1063%2f1.5118038&partnerID=40&md5=c745ddaad8ebca9a542a051284823581 https://irepository.uniten.edu.my/handle/123456789/24566 2129 20030 American Institute of Physics Inc. Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
Every organization that is involved with the construction industry undoubtedly has delayed progress at some phase in their project or development. Delay in construction project become a common situation that contractor, client, or consultant might face. Construction delay can bring bad impacts to the organization itself or the overall development of a nation. From the previous studies, there are many researchers mentioned about the causes and impacts of the construction in Malaysia. However, little effort has been made to reduce this phenomenon in housing projects. Therefore, this research is to determine the delay factors involved in housing projects and rank the delay factors and delay impacts for housing projects. The qualitative method has been used to collect the data by distributing the questionnaire survey which contains 3 sections, the first section was demographic questions, the second section was the delay factors and lastly the delay impacts. The questionnaire was distributed to 30 experts to validate the delay factors that was obtained from the literature reviews and the second stage was targeted to 151 respondents who are involved in the construction industry. Total of sixty-three delay factors were identified with a total of eight groups meanwhile, the impact of delays in construction determined were twelve. Relative Importance Index (RII) method was used to rank those delay factors and impacts. The outcome of the study highlighted the most significant delay factors which are;(1) weather condition; (2) shortage in skilled laborers due to remoteness of site location; (3) progress payment delay by client; (4) award project to lowest bid price and (5) political interference. � 2019 Author(s). |
author2 |
57195984780 |
author_facet |
57195984780 Ramli M.Z. Nordin A. Roslin N.T. Hamid N.B. Azman N.S. Zahari N.M. |
format |
Conference Paper |
author |
Ramli M.Z. Nordin A. Roslin N.T. Hamid N.B. Azman N.S. Zahari N.M. |
spellingShingle |
Ramli M.Z. Nordin A. Roslin N.T. Hamid N.B. Azman N.S. Zahari N.M. Causes of construction delay for housing projects in Malaysia |
author_sort |
Ramli M.Z. |
title |
Causes of construction delay for housing projects in Malaysia |
title_short |
Causes of construction delay for housing projects in Malaysia |
title_full |
Causes of construction delay for housing projects in Malaysia |
title_fullStr |
Causes of construction delay for housing projects in Malaysia |
title_full_unstemmed |
Causes of construction delay for housing projects in Malaysia |
title_sort |
causes of construction delay for housing projects in malaysia |
publisher |
American Institute of Physics Inc. |
publishDate |
2023 |
_version_ |
1806424174841823232 |
score |
13.214268 |