Enhancement of application model for substation site selection
The existing ESASIRF program (Transmission Line Route Selection Application Model and Development of Environmental Sensitive Area (ESA) Safe and Intelligent Route Finder (ESASIRF) and integration with PLS-CAD) does not cover substation selection and environmental protection. It focuses only on an as...
Saved in:
Main Authors: | Baharuddin I.N.Z., Roslan R., Omar R.C., Zulkarnain M.S., Wahab W.A., Solemon B. |
---|---|
Other Authors: | 55812431300 |
Format: | Article |
Published: |
Blue Eyes Intelligence Engineering and Sciences Publication
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Enhancement of application model for substation site selection
by: Baharuddin, I.N.Z., et al.
Published: (2020) -
Integrated site investigation procedure for environment protection toward sustainable development
by: Omar R.C., et al.
Published: (2023) -
Integrated Site Investigation Procedure (ISIP) for Managing Infrastructure Development
by: Omar R.C., et al.
Published: (2023) -
Landslides susceptibility assessment and risk mapping using logistic regression and geographical information system
by: Buslima F., et al.
Published: (2023) -
Flood insurance rate map for non-structural mitigation
by: Roslan, R., et al.
Published: (2020)