Influence of project type, location and area towards construction delay: A review on significance level of delay factors
Construction delay is something that is inevitable, which is why it is a global problem faced by the construction industry. This paper highlighted the characteristics that influenced construction delay but usually ignored in many researches. Project type, location, and area are the characteristics t...
Saved in:
Main Authors: | , , , , , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
Science Publishing Corporation Inc
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-24096 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-240962023-05-29T14:55:23Z Influence of project type, location and area towards construction delay: A review on significance level of delay factors Ramli M.Z. Malek M.A. Hamid B. Roslin N.T. Roslan M.E.M. Norhisham S. Mohd M.F. 57195984780 55636320055 57190252816 57205232728 57189299886 54581400300 57205235894 Construction delay is something that is inevitable, which is why it is a global problem faced by the construction industry. This paper highlighted the characteristics that influenced construction delay but usually ignored in many researches. Project type, location, and area are the characteristics that are not concerned by many. Therefore, this study is reviewing literature in construction delay to find the significance of the influence of the mentioned characteristics. It was found that there is a significant influence of the project type and location towards construction delay problems, where different project type experienced different delay causes. This was probably due to different difficulties faced by each of project type. Project location characteristic also undergoes the same pattern; which is within the same region, the same pattern of major cause was identified. Meanwhile, the insignificant level of influence was identified for the construction area characteristic. This was probably due to the readiness and awareness of contractor regarding the site condition before the construction start. It is expected that this study will open up more discussions regarding these characteristics in the future. � 2018 Authors. Final 2023-05-29T06:55:23Z 2023-05-29T06:55:23Z 2018 Article 10.14419/ijet.v7i4.35.22769 2-s2.0-85059227629 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85059227629&doi=10.14419%2fijet.v7i4.35.22769&partnerID=40&md5=ece9582fe632f1ce7d4946aa3ebffd12 https://irepository.uniten.edu.my/handle/123456789/24096 7 4 392 399 All Open Access, Bronze, Green Science Publishing Corporation Inc Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
Construction delay is something that is inevitable, which is why it is a global problem faced by the construction industry. This paper highlighted the characteristics that influenced construction delay but usually ignored in many researches. Project type, location, and area are the characteristics that are not concerned by many. Therefore, this study is reviewing literature in construction delay to find the significance of the influence of the mentioned characteristics. It was found that there is a significant influence of the project type and location towards construction delay problems, where different project type experienced different delay causes. This was probably due to different difficulties faced by each of project type. Project location characteristic also undergoes the same pattern; which is within the same region, the same pattern of major cause was identified. Meanwhile, the insignificant level of influence was identified for the construction area characteristic. This was probably due to the readiness and awareness of contractor regarding the site condition before the construction start. It is expected that this study will open up more discussions regarding these characteristics in the future. � 2018 Authors. |
author2 |
57195984780 |
author_facet |
57195984780 Ramli M.Z. Malek M.A. Hamid B. Roslin N.T. Roslan M.E.M. Norhisham S. Mohd M.F. |
format |
Article |
author |
Ramli M.Z. Malek M.A. Hamid B. Roslin N.T. Roslan M.E.M. Norhisham S. Mohd M.F. |
spellingShingle |
Ramli M.Z. Malek M.A. Hamid B. Roslin N.T. Roslan M.E.M. Norhisham S. Mohd M.F. Influence of project type, location and area towards construction delay: A review on significance level of delay factors |
author_sort |
Ramli M.Z. |
title |
Influence of project type, location and area towards construction delay: A review on significance level of delay factors |
title_short |
Influence of project type, location and area towards construction delay: A review on significance level of delay factors |
title_full |
Influence of project type, location and area towards construction delay: A review on significance level of delay factors |
title_fullStr |
Influence of project type, location and area towards construction delay: A review on significance level of delay factors |
title_full_unstemmed |
Influence of project type, location and area towards construction delay: A review on significance level of delay factors |
title_sort |
influence of project type, location and area towards construction delay: a review on significance level of delay factors |
publisher |
Science Publishing Corporation Inc |
publishDate |
2023 |
_version_ |
1806428126924767232 |
score |
13.214268 |