Field investigation on limestone treatment using fissure grouting method
This paper documents a field study on fissure grouting for limestone with a specific aim to investigate grout injection into the rock in order to reduce its permeability. The study focused on grouting in advance of excavation and it is applicable to grouting carried out to seal exposed rock surfaces...
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
Science Publishing Corporation Inc
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-24088 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-240882023-05-29T14:55:16Z Field investigation on limestone treatment using fissure grouting method Ananthan P. Wong L.S. 57205237763 55504782500 This paper documents a field study on fissure grouting for limestone with a specific aim to investigate grout injection into the rock in order to reduce its permeability. The study focused on grouting in advance of excavation and it is applicable to grouting carried out to seal exposed rock surfaces. Investigation concentrated on the need to carry out fissure grouting to seal off excessive water entering the excavation through fractured rocks. In this case, the grout mixtures involved a combination of Ordinary Portland cement (OPC) and bentonite with appropriate amount of water. The grouting was performed at each stage until the grout flow rate and pressure reached a constant level for the last five minutes. If the stage of grouting in a borehole required more grout, this implies that there exist more fissure and cracks in the rock. The ultimate outcome of the rock fissure grouting was to obtain a good feed into limestone rock fissures, and thus, the process involved high injection pressure. The minimum grouting pressure was indicated as the hydrostatic pressure plus line loss pressure. To ensure that the outcome was achieved, it was recommended for an additional two bar pressure to be maintained as hydrostatic pressure. � 2018 Authors. Final 2023-05-29T06:55:16Z 2023-05-29T06:55:16Z 2018 Article 10.14419/ijet.v7i4.35.22757 2-s2.0-85059228810 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85059228810&doi=10.14419%2fijet.v7i4.35.22757&partnerID=40&md5=e72b4ec5cc7ef2d1f210ff57cd36183d https://irepository.uniten.edu.my/handle/123456789/24088 7 4 338 341 All Open Access, Bronze, Green Science Publishing Corporation Inc Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
This paper documents a field study on fissure grouting for limestone with a specific aim to investigate grout injection into the rock in order to reduce its permeability. The study focused on grouting in advance of excavation and it is applicable to grouting carried out to seal exposed rock surfaces. Investigation concentrated on the need to carry out fissure grouting to seal off excessive water entering the excavation through fractured rocks. In this case, the grout mixtures involved a combination of Ordinary Portland cement (OPC) and bentonite with appropriate amount of water. The grouting was performed at each stage until the grout flow rate and pressure reached a constant level for the last five minutes. If the stage of grouting in a borehole required more grout, this implies that there exist more fissure and cracks in the rock. The ultimate outcome of the rock fissure grouting was to obtain a good feed into limestone rock fissures, and thus, the process involved high injection pressure. The minimum grouting pressure was indicated as the hydrostatic pressure plus line loss pressure. To ensure that the outcome was achieved, it was recommended for an additional two bar pressure to be maintained as hydrostatic pressure. � 2018 Authors. |
author2 |
57205237763 |
author_facet |
57205237763 Ananthan P. Wong L.S. |
format |
Article |
author |
Ananthan P. Wong L.S. |
spellingShingle |
Ananthan P. Wong L.S. Field investigation on limestone treatment using fissure grouting method |
author_sort |
Ananthan P. |
title |
Field investigation on limestone treatment using fissure grouting method |
title_short |
Field investigation on limestone treatment using fissure grouting method |
title_full |
Field investigation on limestone treatment using fissure grouting method |
title_fullStr |
Field investigation on limestone treatment using fissure grouting method |
title_full_unstemmed |
Field investigation on limestone treatment using fissure grouting method |
title_sort |
field investigation on limestone treatment using fissure grouting method |
publisher |
Science Publishing Corporation Inc |
publishDate |
2023 |
_version_ |
1806428075775229952 |
score |
13.214268 |