Cost evaluation of proposed decommissioning plan of CANDU reactor
Nuclear decommissioning is the final technical and administrative process in the life cycle of nuclear power operation. Experience over the last decade has demonstrated that in general, the process of decommissioning and its cost evaluation has reached industrial maturity, although specific techniqu...
Saved in:
Main Authors: | , , , , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
Taylor's University
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-23667 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-236672023-05-29T14:50:53Z Cost evaluation of proposed decommissioning plan of CANDU reactor Khattak M.A. Omran A.A.B. Khan M.S. Ali H.M. Nawaz S. Khan Z. 55909928700 55212152300 57191855494 55749198400 57529789400 57210107904 Nuclear decommissioning is the final technical and administrative process in the life cycle of nuclear power operation. Experience over the last decade has demonstrated that in general, the process of decommissioning and its cost evaluation has reached industrial maturity, although specific techniques continue to evolve. Owners and licensees of nuclear power plants are generally responsible for developing cost estimates of decommissioning, and a good understanding of these costs is fundamental for the development of estimates based on realistic decommissioning plans. The use of these techniques in the cost evaluation of the decommissioning of nuclear facilities continues to increase this experience. This research has been carried out keeping in mind to evaluate an economical and feasible cost for the proposed decommissioning plan of CANDU (Canada Deuterium Uranium) reactor. Work is done in the major areas of cost estimations for DECON (immediate dismantling), SAFESTOR (deferred dismantling) and ENTOMB (on site end-state). These alternatives were analysed and SAFSTOR method was recommended for 40+ years old, Canadian designed, first generation CANDU reactor decommissioning. This paper provides a cost estimation for a decommissioning as recommended in the analysis performed. A cost of 200 Million $ is evaluated for SAFSTOR decommissioning alternative of proposed CANDU reactor. � School of Engineering, Taylor�s University. Final 2023-05-29T06:50:53Z 2023-05-29T06:50:53Z 2018 Article 2-s2.0-85057599281 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85057599281&partnerID=40&md5=e3bb97ba798c1a8d9e7c5e28f373c5eb https://irepository.uniten.edu.my/handle/123456789/23667 13 10 3173 3189 Taylor's University Scopus |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
description |
Nuclear decommissioning is the final technical and administrative process in the life cycle of nuclear power operation. Experience over the last decade has demonstrated that in general, the process of decommissioning and its cost evaluation has reached industrial maturity, although specific techniques continue to evolve. Owners and licensees of nuclear power plants are generally responsible for developing cost estimates of decommissioning, and a good understanding of these costs is fundamental for the development of estimates based on realistic decommissioning plans. The use of these techniques in the cost evaluation of the decommissioning of nuclear facilities continues to increase this experience. This research has been carried out keeping in mind to evaluate an economical and feasible cost for the proposed decommissioning plan of CANDU (Canada Deuterium Uranium) reactor. Work is done in the major areas of cost estimations for DECON (immediate dismantling), SAFESTOR (deferred dismantling) and ENTOMB (on site end-state). These alternatives were analysed and SAFSTOR method was recommended for 40+ years old, Canadian designed, first generation CANDU reactor decommissioning. This paper provides a cost estimation for a decommissioning as recommended in the analysis performed. A cost of 200 Million $ is evaluated for SAFSTOR decommissioning alternative of proposed CANDU reactor. � School of Engineering, Taylor�s University. |
author2 |
55909928700 |
author_facet |
55909928700 Khattak M.A. Omran A.A.B. Khan M.S. Ali H.M. Nawaz S. Khan Z. |
format |
Article |
author |
Khattak M.A. Omran A.A.B. Khan M.S. Ali H.M. Nawaz S. Khan Z. |
spellingShingle |
Khattak M.A. Omran A.A.B. Khan M.S. Ali H.M. Nawaz S. Khan Z. Cost evaluation of proposed decommissioning plan of CANDU reactor |
author_sort |
Khattak M.A. |
title |
Cost evaluation of proposed decommissioning plan of CANDU reactor |
title_short |
Cost evaluation of proposed decommissioning plan of CANDU reactor |
title_full |
Cost evaluation of proposed decommissioning plan of CANDU reactor |
title_fullStr |
Cost evaluation of proposed decommissioning plan of CANDU reactor |
title_full_unstemmed |
Cost evaluation of proposed decommissioning plan of CANDU reactor |
title_sort |
cost evaluation of proposed decommissioning plan of candu reactor |
publisher |
Taylor's University |
publishDate |
2023 |
_version_ |
1806428291927638016 |
score |
13.214268 |