Causes of delay on highway construction project in Klang valley

Construction is a vital industry in all of the countries especially in the developing country such as Malaysia. Moreover, highway construction is very important as it act as a network to connect from one place to another. Delay is a major problem in the construction industry and it is quite challeng...

Full description

Saved in:
Bibliographic Details
Main Authors: Karunakaran S., Ramli M.Z., Malek M.A., Musir A.A., Imran N.F., Fuad N.F.S.M., Zawawi M.H., Zainal M.Z.
Other Authors: 57204943131
Format: Conference Paper
Published: American Institute of Physics Inc. 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-23582
record_format dspace
spelling my.uniten.dspace-235822023-05-29T14:50:20Z Causes of delay on highway construction project in Klang valley Karunakaran S. Ramli M.Z. Malek M.A. Musir A.A. Imran N.F. Fuad N.F.S.M. Zawawi M.H. Zainal M.Z. 57204943131 57195984780 55636320055 57200119679 57204417667 57200211615 39162217600 57195979188 Construction is a vital industry in all of the countries especially in the developing country such as Malaysia. Moreover, highway construction is very important as it act as a network to connect from one place to another. Delay is a major problem in the construction industry and it is quite challenging to avoid in the construction project. When the project delays, it definitely affects the cost and the quality of the project as well. The main objective of this study is to determine the factors that contributes to the delays in the highway construction project and its significance level towards the respective project. Data collection are gathered based on pilot survey and questionnaire. Then, it followed with the ranking and significance level analysis with the method of Relative Importance Index. Thus, based on the RII ranking, the top five factors was the improper planning, weather, poor site management, poor site investigation and underground utilities. The RII value for the top most and lowest factor was 0.851 and 0.671 respectively. � 2018 Author(s). Final 2023-05-29T06:50:20Z 2023-05-29T06:50:20Z 2018 Conference Paper 10.1063/1.5066883 2-s2.0-85058004350 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85058004350&doi=10.1063%2f1.5066883&partnerID=40&md5=8f1c3222d48a4ec6e227105f9421dfb7 https://irepository.uniten.edu.my/handle/123456789/23582 2030 20242 American Institute of Physics Inc. Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Construction is a vital industry in all of the countries especially in the developing country such as Malaysia. Moreover, highway construction is very important as it act as a network to connect from one place to another. Delay is a major problem in the construction industry and it is quite challenging to avoid in the construction project. When the project delays, it definitely affects the cost and the quality of the project as well. The main objective of this study is to determine the factors that contributes to the delays in the highway construction project and its significance level towards the respective project. Data collection are gathered based on pilot survey and questionnaire. Then, it followed with the ranking and significance level analysis with the method of Relative Importance Index. Thus, based on the RII ranking, the top five factors was the improper planning, weather, poor site management, poor site investigation and underground utilities. The RII value for the top most and lowest factor was 0.851 and 0.671 respectively. � 2018 Author(s).
author2 57204943131
author_facet 57204943131
Karunakaran S.
Ramli M.Z.
Malek M.A.
Musir A.A.
Imran N.F.
Fuad N.F.S.M.
Zawawi M.H.
Zainal M.Z.
format Conference Paper
author Karunakaran S.
Ramli M.Z.
Malek M.A.
Musir A.A.
Imran N.F.
Fuad N.F.S.M.
Zawawi M.H.
Zainal M.Z.
spellingShingle Karunakaran S.
Ramli M.Z.
Malek M.A.
Musir A.A.
Imran N.F.
Fuad N.F.S.M.
Zawawi M.H.
Zainal M.Z.
Causes of delay on highway construction project in Klang valley
author_sort Karunakaran S.
title Causes of delay on highway construction project in Klang valley
title_short Causes of delay on highway construction project in Klang valley
title_full Causes of delay on highway construction project in Klang valley
title_fullStr Causes of delay on highway construction project in Klang valley
title_full_unstemmed Causes of delay on highway construction project in Klang valley
title_sort causes of delay on highway construction project in klang valley
publisher American Institute of Physics Inc.
publishDate 2023
_version_ 1806427566725136384
score 13.214268