Development of condition rating of shotcrete lining of hydroelectric power station based on condition assessment of its distresses
Tunnel underground structure often exposed to an extensive deterioration especially on the tunnel lining. Water leakage is the most common distress occurred in tunnel subsequently causing other distresses to form. After providing services over years, evaluation of shotcrete tunnel lining of undergro...
Saved in:
Main Authors: | Usman F., Banuar N., Muda Z.C. |
---|---|
Other Authors: | 55812540000 |
Format: | Article |
Published: |
Asian Research Publishing Network
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Risk analysis of hydroelectric power station considering identified risk factors based on condition distress rating
by: Usman F., et al.
Published: (2023) -
Analysis of shotcrete lining of underground tunnels
by: Ghiasi, Vahed, et al.
Published: (2011) -
Evaluation of Condition Assessment of Tunnel Lining using Inspection Manual of CIRIA and FHWA
by: Usman F., et al.
Published: (2023) -
Optimum region of operation for a 108 MW hydroelectric power station
by: Low, Patrick Tiong Kie
Published: (1998) -
Analysis of Climate-Net Unit Generated (NUG) Relationship for the Hydroelectric Power Station
by: Azman A.H., et al.
Published: (2023)