Hydrological Analysis for Inflow Forecasting into Temengor Dam

Artificial intelligence; Calibration; Catchments; Dams; Decision support systems; Disasters; Flood control; Floods; Forecasting; Reservoirs (water); Runoff; Travel time; Decision supports; Flood hydrographs; Forecasting modeling; Hydrological analysis; Natural disasters; Operational decision support...

Full description

Saved in:
Bibliographic Details
Main Authors: Najid M.I., Sidek L.M., Hidayah B., Roseli Z.A.
Other Authors: 57189249193
Format: Conference Paper
Published: Institute of Physics Publishing 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-22777
record_format dspace
spelling my.uniten.dspace-227772023-05-29T14:12:11Z Hydrological Analysis for Inflow Forecasting into Temengor Dam Najid M.I. Sidek L.M. Hidayah B. Roseli Z.A. 57189249193 35070506500 57065823300 55746324600 Artificial intelligence; Calibration; Catchments; Dams; Decision support systems; Disasters; Flood control; Floods; Forecasting; Reservoirs (water); Runoff; Travel time; Decision supports; Flood hydrographs; Forecasting modeling; Hydrological analysis; Natural disasters; Operational decision support; Rainfall contributions; Rainfall distribution; Rain; calibration; catchment; dam; decision support system; flood; flood control; flood forecasting; hydrograph; hydrological modeling; inflow; monsoon; peak discharge; prediction; rainfall; reservoir; warning system; Malaysia; Perak; Perak River; Temenggor Reservoir; West Malaysia These days, natural disaster such as flood is the main concern for hydrologists. One of solutions in understanding the reason of flood is by prediction of the event sooner than normal occurrence. One of the criteria is lead time or travel time that is important in the study of fresh waters and flood events. Therefore, estimation of lead or travel time for flood event can be beneficial primary information. The objective of this study is to estimate the lead time or travel time for outlet of Temengor dam in Malaysia. Tenaga Nasional Berhad (TNB) Sungai Perak dam operation has the main contribution on decision support for early water released and flood warning to authorities and locals resident for in the down streams area. For this study, hydrological analysis carried out will help to determine which years that give more rainfall contribution into the reservoir. Rainfall contribution of reservoir help to understanding rainfall distribution and peak discharge on that period. It also help for calibration of forecasting model system for better accuracy of flood hydrograph. There may be various methods to determine the rainfall contribution of catchment. The result has shown that, the rainfall contribution for Temengor catchment, is more on November in each year which is the monsoon season in Malaysia. TNB dam operational decision support systems can prepare and be more aware at this time for flood control and flood mitigation. Final 2023-05-29T06:12:11Z 2023-05-29T06:12:11Z 2016 Conference Paper 10.1088/1755-1315/32/1/012067 2-s2.0-84966560414 https://www.scopus.com/inward/record.uri?eid=2-s2.0-84966560414&doi=10.1088%2f1755-1315%2f32%2f1%2f012067&partnerID=40&md5=edfd08e157baf6ee7ee7c3180fa5ac00 https://irepository.uniten.edu.my/handle/123456789/22777 32 1 12067 All Open Access, Bronze Institute of Physics Publishing Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Artificial intelligence; Calibration; Catchments; Dams; Decision support systems; Disasters; Flood control; Floods; Forecasting; Reservoirs (water); Runoff; Travel time; Decision supports; Flood hydrographs; Forecasting modeling; Hydrological analysis; Natural disasters; Operational decision support; Rainfall contributions; Rainfall distribution; Rain; calibration; catchment; dam; decision support system; flood; flood control; flood forecasting; hydrograph; hydrological modeling; inflow; monsoon; peak discharge; prediction; rainfall; reservoir; warning system; Malaysia; Perak; Perak River; Temenggor Reservoir; West Malaysia
author2 57189249193
author_facet 57189249193
Najid M.I.
Sidek L.M.
Hidayah B.
Roseli Z.A.
format Conference Paper
author Najid M.I.
Sidek L.M.
Hidayah B.
Roseli Z.A.
spellingShingle Najid M.I.
Sidek L.M.
Hidayah B.
Roseli Z.A.
Hydrological Analysis for Inflow Forecasting into Temengor Dam
author_sort Najid M.I.
title Hydrological Analysis for Inflow Forecasting into Temengor Dam
title_short Hydrological Analysis for Inflow Forecasting into Temengor Dam
title_full Hydrological Analysis for Inflow Forecasting into Temengor Dam
title_fullStr Hydrological Analysis for Inflow Forecasting into Temengor Dam
title_full_unstemmed Hydrological Analysis for Inflow Forecasting into Temengor Dam
title_sort hydrological analysis for inflow forecasting into temengor dam
publisher Institute of Physics Publishing
publishDate 2023
_version_ 1806425786654130176
score 13.214268