Cascade hydroelectric scheme: River flow estimation for reservoir regulation improvement and flood-risk mitigation
Budget control; Control systems; Estimation; Flood control; Floods; Flow measurement; Flow of water; Hydraulics; Hydroelectric power plants; Risk assessment; Risk management; Risk perception; Rivers; Stream flow; Travel time; Water levels; Flood risk management; Flood risks; Historical background; H...
Saved in:
Main Authors: | Jidin R., Othman A.B. |
---|---|
Other Authors: | 6508169028 |
Format: | Conference Paper |
Published: |
Institute of Electrical and Electronics Engineers Inc.
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Sensitivity Analysis of Hydroelectric Power Generation from Cascading Reservoirs
by: Asfaw, Tilahun Derib, et al.
Published: (2013) -
Dam Break Modelling and Flood Hazard Mapping for Cascading Dams in Sungai Perak Hydroelectric Scheme
by: Mohd Sidek L., et al.
Published: (2023) -
Assessing dam spillway discharge capacity in response to extreme floods in Perak river hydroelectric scheme: Simulation and proposed mitigation measures
by: Azha S.F., et al.
Published: (2024) -
Competence-Oriented Decision Model for Optimizing the Operation of a Cascading Hydroelectric Power Reservoir
by: Asfaw, Tilahun Derib, et al.
Published: (2013) -
Fish Assemblages in Murum Hydroelectric Reservoir and Plieran River, Belaga, Sarawak
by: Kirollina, Kisun.
Published: (2015)