Study of Causes Affecting Time Overrun of Construction For Contractor Grade G4 in Kuala Lumpur, Malaysia
Interim Semester 2020/2021
Saved in:
Main Author: | Iqbal Zharif bin Bunaim |
---|---|
Format: | text::Thesis |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development of automated fruit grading system using vision and artificial intelligent technique
by: Muhamad Amin Zunaidi, Zainal Abidin
Published: (2016) -
Functionally graded materials as interplayer to enhance mechanical bonding
by: Mohd Nur Haikal Md Sharif
Published: (2024) -
Malaysian contractors' total overseas jobs
by: Construction Industry Development Board
Published: (2013) -
Construction waste management in construction project by using 3R principle: G7 contractors’ perspective / Muhammad Luqman Nul Hakim Ismail and Mohd Firdaus Zainuddin
by: Ismail, Muhammad Luqman Nul Hakim, et al.
Published: (2023) -
Cost control during construction stage among G6 and G7 contractors in Kuala Lumpur / Siti Munirah Mat Zuhari
by: Mat Zuhari, Siti Munirah
Published: (2021)