Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way

FYP 2 Sem 1 2019/2020

Saved in:
Bibliographic Details
Main Author: Mohammad Syazwi bin Sabri
Format:
Published: 2023
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-20584
record_format dspace
spelling my.uniten.dspace-205842023-05-04T12:52:19Z Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way Mohammad Syazwi bin Sabri Cost Benefit Analysis Energy Dissipator Kenyir Dam Spillway FYP 2 Sem 1 2019/2020 Hydropower or water power is a power derived from energy of falling water or fast running water which can be used for useful purposes that is producing large-scale power and electricity. Hydropower is the only renewable energy technology that is commercially viable on a large scale in Malaysia such as at Kenyir hydropower station in Terengganu. A spillway is a structure used to provide the controlled release of flows from a dam which ensure that the water does not over flow and damage or destroyed the dam. Thus, energy dissipators which is any mechanism designed to protect downstream areas from erosion by reducing the velocity of water flow to tolerable limits is built to prevent overflow of water at spillway. In this study, gabion block with length of 330m are plan to be built along the spillway at Kenyir hydropower dam. After discussion with all the design team, granite stone with size 6" x 9" is used to make gabion blocks. This is because, the granite with size 6" x 9" was chosen because it is more suitable for use with 4m x 1m x 1m fence and the fence used is coated galvanized wire. In order to build gabion blocks for 330m in Kenyir hydropower dam, some equipment needs to be used to facilitate the construction which includes mobile cranes (16 tonnes), excavator and rock breaker excavators. After certain design of energy dissipators are evaluated in a project, it effectiveness need to be judge thus, cost-benefit analysis can be used as the judgemental tools. Cost-benefit analysis (CBA) is vital analytical tools in assist in making judgments and appraising available options which it provides evidenced by the vast amounts of literature available from academics, CBA practitioners, and government agencies in both domestically and abroad. In this study, net present value is used to determine the suitable gabion block building along the Kenyir hydropower dam spillway. Therefore, CBA is used to select the best option of the mitigation measures for the natural rock erosion at Kenyir hydropower dam spillway by using the net present value method. iv 2023-05-03T15:06:54Z 2023-05-03T15:06:54Z 2019-10 https://irepository.uniten.edu.my/handle/123456789/20584 application/pdf
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
topic Cost Benefit Analysis
Energy Dissipator
Kenyir Dam Spillway
spellingShingle Cost Benefit Analysis
Energy Dissipator
Kenyir Dam Spillway
Mohammad Syazwi bin Sabri
Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way
description FYP 2 Sem 1 2019/2020
format
author Mohammad Syazwi bin Sabri
author_facet Mohammad Syazwi bin Sabri
author_sort Mohammad Syazwi bin Sabri
title Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way
title_short Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way
title_full Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way
title_fullStr Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way
title_full_unstemmed Cost Benefit Analysis (CBE) For Mitigation Measures Natural Rock Erosion At Kenyir Hydropower Dam Spill Way
title_sort cost benefit analysis (cbe) for mitigation measures natural rock erosion at kenyir hydropower dam spill way
publishDate 2023
_version_ 1806423262704435200
score 13.19449