Case Study: Applying Muda ( Toyota Production System)...

FYP 2, Sem 1 2019/2020

Saved in:
Bibliographic Details
Main Author: Ahmad Zulhilmi Bin Dzulkifli
Format:
Published: 2023
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-20525
record_format dspace
spelling my.uniten.dspace-205252023-05-03T23:04:00Z Case Study: Applying Muda ( Toyota Production System)... Ahmad Zulhilmi Bin Dzulkifli MUDA, Toyota Production System ( TPS) Productivity FYP 2, Sem 1 2019/2020 ABSTRACT Manufacturing wastes or commonly known as MUDA are non-beneficial to any manufacturers and should be reduced or eliminated for better manufacturing processes. This paper focus on methods to reduce four specific wastes (Transportation waste, Over Processing waste, Overproduction waste and Inventory Loss), awareness on MUDA and effects of JIT implementation to automotive industry. Literature review was done to identify methods to eliminate the four specific wastes. Two questionnaires were distributed to a company to investigate awareness on MUDA as well as its effects to manufacturer. Results obtained from the questionnaire were then validated through Statistical Package for the Social Sciences Software (SPSS) to identify the validity of the questions. 2023-05-03T15:04:00Z 2023-05-03T15:04:00Z 2019-10 https://irepository.uniten.edu.my/handle/123456789/20525
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
topic MUDA,
Toyota Production System ( TPS)
Productivity
spellingShingle MUDA,
Toyota Production System ( TPS)
Productivity
Ahmad Zulhilmi Bin Dzulkifli
Case Study: Applying Muda ( Toyota Production System)...
description FYP 2, Sem 1 2019/2020
format
author Ahmad Zulhilmi Bin Dzulkifli
author_facet Ahmad Zulhilmi Bin Dzulkifli
author_sort Ahmad Zulhilmi Bin Dzulkifli
title Case Study: Applying Muda ( Toyota Production System)...
title_short Case Study: Applying Muda ( Toyota Production System)...
title_full Case Study: Applying Muda ( Toyota Production System)...
title_fullStr Case Study: Applying Muda ( Toyota Production System)...
title_full_unstemmed Case Study: Applying Muda ( Toyota Production System)...
title_sort case study: applying muda ( toyota production system)...
publishDate 2023
_version_ 1806425974069264384
score 13.188404