Comparison Of Pile Axial Loading Design Base On Eurocode 7 And British Standard
Piling construction are always the best solution to solve the problem that ground condition at the selected site do not have enough geotechnical capacity. In Malaysia, the tradition and efficient method and standard used is known as British Standard. The method that being adopted are too conserva...
Saved in:
Main Author: | |
---|---|
Format: | |
Published: |
2023
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | Piling construction are always the best solution to solve the problem that ground
condition at the selected site do not have enough geotechnical capacity. In Malaysia,
the tradition and efficient method and standard used is known as British Standard. The
method that being adopted are too conservative and do not consider some of the soil
parameter and pile testing. Thus, a newly recognized codes has been introduced into the
industry which is known as Eurocode 7. In the project, a six-storey apartment has been
proposed to build on the selected site. The column loading of the apartment has been
provided by the structural engineer. The main objective of the project is to design the
pile foundation using British Standard and also Eurocode 7. In the design stage, Semi-
Empirical Method has been adopted foe the design as the bedrock level in then site
given is very shallow. In the design stage, the subsurface investigation data and the soil
parameter generated by the lab test has been provided. The range of design included the
calculation of soil shaft resistance, rock base resistance and also rock socket needed foe
rock shaft resistance. After the design, the result generated by BS and also EC7 will be
compare and discuss. The range of comparison included the safety factor adopted, pile
design method, soil parameter used and also costing of the pile construction. All the
data generated has been compared and summaries out in a table and figure form. |
---|