Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor
In the beginning of the 21st century, several research institutions and also private companies had proposed various design of thorium-based nuclear reactor, ranging from solid fuel to molten fuel, fast and thermal neutron spectrum and also various path of waste management. This paper studies 10 of t...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Paper |
Language: | English |
Published: |
2020
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.uniten.dspace-12959 |
---|---|
record_format |
dspace |
spelling |
my.uniten.dspace-129592020-07-07T02:58:35Z Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor Muhamad Pauzi, A. Abdul Wahid, A.W. Saad, J. In the beginning of the 21st century, several research institutions and also private companies had proposed various design of thorium-based nuclear reactor, ranging from solid fuel to molten fuel, fast and thermal neutron spectrum and also various path of waste management. This paper studies 10 of the proposed reactor designs by 10 different organizations, three key aspects analysed quantitatively namely price per kilowatt, safety features and spent fuel managements. Corresponding factors contributing to the key aspects mentioned above were gathered, weighted based on evidence available and analysed using decision matrix. Based on the information collected, preliminary ranking were constructed based on trends between various factors. © Published under licence by IOP Publishing Ltd. 2020-02-03T03:28:06Z 2020-02-03T03:28:06Z 2019 Conference Paper 10.1088/1757-899X/555/1/012006 en |
institution |
Universiti Tenaga Nasional |
building |
UNITEN Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Tenaga Nasional |
content_source |
UNITEN Institutional Repository |
url_provider |
http://dspace.uniten.edu.my/ |
language |
English |
description |
In the beginning of the 21st century, several research institutions and also private companies had proposed various design of thorium-based nuclear reactor, ranging from solid fuel to molten fuel, fast and thermal neutron spectrum and also various path of waste management. This paper studies 10 of the proposed reactor designs by 10 different organizations, three key aspects analysed quantitatively namely price per kilowatt, safety features and spent fuel managements. Corresponding factors contributing to the key aspects mentioned above were gathered, weighted based on evidence available and analysed using decision matrix. Based on the information collected, preliminary ranking were constructed based on trends between various factors. © Published under licence by IOP Publishing Ltd. |
format |
Conference Paper |
author |
Muhamad Pauzi, A. Abdul Wahid, A.W. Saad, J. |
spellingShingle |
Muhamad Pauzi, A. Abdul Wahid, A.W. Saad, J. Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor |
author_facet |
Muhamad Pauzi, A. Abdul Wahid, A.W. Saad, J. |
author_sort |
Muhamad Pauzi, A. |
title |
Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor |
title_short |
Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor |
title_full |
Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor |
title_fullStr |
Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor |
title_full_unstemmed |
Preliminary quantitative feasibility analysis of proposed Thorium-based nuclear reactor |
title_sort |
preliminary quantitative feasibility analysis of proposed thorium-based nuclear reactor |
publishDate |
2020 |
_version_ |
1672614193357914112 |
score |
13.214268 |