Hydropower potential of agricultural dam in Bukit Merah

Malaysia, although having a good number of small to medium hydro power potential sites, has still not exploited all of them. The focus of this manuscript is a feasibility study of the technical viability of power generation from a medium hydropower potential site, the Bukit Merah Dam site, on the Te...

Full description

Saved in:
Bibliographic Details
Main Authors: Roslan, E., Shaari, S., Zamri, F., Akhiar, A., Salleh, F., Ramli, Z., Shamsuddin, A.H.
Format: Article
Language:English
Published: 2020
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-12778
record_format dspace
spelling my.uniten.dspace-127782020-07-08T01:49:41Z Hydropower potential of agricultural dam in Bukit Merah Roslan, E. Shaari, S. Zamri, F. Akhiar, A. Salleh, F. Ramli, Z. Shamsuddin, A.H. Malaysia, although having a good number of small to medium hydro power potential sites, has still not exploited all of them. The focus of this manuscript is a feasibility study of the technical viability of power generation from a medium hydropower potential site, the Bukit Merah Dam site, on the Terusan Besar irrigation canal in northern region of Malaysia. This study is carried out using flow data of 2016 from the main irrigation canal of Bukit Merah dam. The data was obtained from Department of Irrigation and Drainage, Perak. The power capacity, yearly energy output of the potential hydro site are studied in this work. Technical analysis of the power output capacity and yearly energy output of three (3) hydro-turbine types (Kaplan, Propeller, and Francis) operable at the same given head and design flow were studied. The study shows that there is a potential capacity of 2.2 MW and an annual energy generation capacity of 7028.47 MWh at a turbine peak efficiency of 92.8% at a design flow of 19.23 m3/s using Kaplan turbine. © BEIESP. 2020-02-03T03:26:43Z 2020-02-03T03:26:43Z 2019 Article 10.35940/ijrte.D5114.118419 en
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
language English
description Malaysia, although having a good number of small to medium hydro power potential sites, has still not exploited all of them. The focus of this manuscript is a feasibility study of the technical viability of power generation from a medium hydropower potential site, the Bukit Merah Dam site, on the Terusan Besar irrigation canal in northern region of Malaysia. This study is carried out using flow data of 2016 from the main irrigation canal of Bukit Merah dam. The data was obtained from Department of Irrigation and Drainage, Perak. The power capacity, yearly energy output of the potential hydro site are studied in this work. Technical analysis of the power output capacity and yearly energy output of three (3) hydro-turbine types (Kaplan, Propeller, and Francis) operable at the same given head and design flow were studied. The study shows that there is a potential capacity of 2.2 MW and an annual energy generation capacity of 7028.47 MWh at a turbine peak efficiency of 92.8% at a design flow of 19.23 m3/s using Kaplan turbine. © BEIESP.
format Article
author Roslan, E.
Shaari, S.
Zamri, F.
Akhiar, A.
Salleh, F.
Ramli, Z.
Shamsuddin, A.H.
spellingShingle Roslan, E.
Shaari, S.
Zamri, F.
Akhiar, A.
Salleh, F.
Ramli, Z.
Shamsuddin, A.H.
Hydropower potential of agricultural dam in Bukit Merah
author_facet Roslan, E.
Shaari, S.
Zamri, F.
Akhiar, A.
Salleh, F.
Ramli, Z.
Shamsuddin, A.H.
author_sort Roslan, E.
title Hydropower potential of agricultural dam in Bukit Merah
title_short Hydropower potential of agricultural dam in Bukit Merah
title_full Hydropower potential of agricultural dam in Bukit Merah
title_fullStr Hydropower potential of agricultural dam in Bukit Merah
title_full_unstemmed Hydropower potential of agricultural dam in Bukit Merah
title_sort hydropower potential of agricultural dam in bukit merah
publishDate 2020
_version_ 1672614174526537728
score 13.222552