Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization)

The development of water transport in Sarawak, Malaysia is considered to be in the early stages. There are possibilities that the water transport system in Sarawak can be improved and made a contributor to enhancing the public transportation system in the state. The Sarawak Rivers Board, Kuching Exp...

Full description

Saved in:
Bibliographic Details
Main Author: Franklin, Simon
Format: Final Year Project Report
Language:English
English
Published: Universiti Malaysia Sarawak, UNIMAS 2010
Subjects:
Online Access:http://ir.unimas.my/id/eprint/7796/1/Risk%20assessment%20for%20river%20transport%20Kuching%20express%20boat%20passenger%20terminal%20%28maintenance%20%26%20utilization%29%2024pgs.pdf
http://ir.unimas.my/id/eprint/7796/8/Franklin%20Simon%20ft.pdf
http://ir.unimas.my/id/eprint/7796/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimas.ir.7796
record_format eprints
spelling my.unimas.ir.77962023-08-30T03:45:34Z http://ir.unimas.my/id/eprint/7796/ Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization) Franklin, Simon QC Physics T Technology (General) The development of water transport in Sarawak, Malaysia is considered to be in the early stages. There are possibilities that the water transport system in Sarawak can be improved and made a contributor to enhancing the public transportation system in the state. The Sarawak Rivers Board, Kuching Express Boat Passenger Terminal was the targeted area of study. This study focused on the conducting of qualitative and quantitative risk assessment on the maintenance and utilization of the passenger terminal. Such studies have yet to be performed in the state. Therefore, this study will benefit the development of the water transport industry in Sarawak. Distribution of survey questionnaires were carried out for the qualitative risk assessment while a method known as the Fuzzy Failure Mode and Effect Analysis (FMEA) has been adopted for the quantitative risk assessment. Furthermore, scale ranking table of ratings for severity, occurrence and detect were used to carry out the fuzzy FMEA method. Results obtained from the fuzzy FMEA method were in the form of fuzzy RPN number, which are the products of severity, occurrence and detect. From the analysis, life rafts have the highest fuzzy RPN at 351 (323 if normalized) while the lowest fuzzy RPN was obtained from railings (83.9, 5 if normalized). Life rafts were rated highest while railings were rated lowest in the fuzzy RPN number rankings. However, values obtained from the method were not as projected theoretically due to its shortcomings, such as existence of loop holes in membership functions. Future improvements of the method may include the modification of the scale tables to suit better risk assessment for any river infrastructure. In conclusion, the fuzzy FMEA method was proven to be applicable in conducting risk assessment on a river infrastructure in terms of maintenance and utilization. Universiti Malaysia Sarawak, UNIMAS 2010 Final Year Project Report NonPeerReviewed text en http://ir.unimas.my/id/eprint/7796/1/Risk%20assessment%20for%20river%20transport%20Kuching%20express%20boat%20passenger%20terminal%20%28maintenance%20%26%20utilization%29%2024pgs.pdf text en http://ir.unimas.my/id/eprint/7796/8/Franklin%20Simon%20ft.pdf Franklin, Simon (2010) Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization). [Final Year Project Report] (Unpublished)
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
English
topic QC Physics
T Technology (General)
spellingShingle QC Physics
T Technology (General)
Franklin, Simon
Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization)
description The development of water transport in Sarawak, Malaysia is considered to be in the early stages. There are possibilities that the water transport system in Sarawak can be improved and made a contributor to enhancing the public transportation system in the state. The Sarawak Rivers Board, Kuching Express Boat Passenger Terminal was the targeted area of study. This study focused on the conducting of qualitative and quantitative risk assessment on the maintenance and utilization of the passenger terminal. Such studies have yet to be performed in the state. Therefore, this study will benefit the development of the water transport industry in Sarawak. Distribution of survey questionnaires were carried out for the qualitative risk assessment while a method known as the Fuzzy Failure Mode and Effect Analysis (FMEA) has been adopted for the quantitative risk assessment. Furthermore, scale ranking table of ratings for severity, occurrence and detect were used to carry out the fuzzy FMEA method. Results obtained from the fuzzy FMEA method were in the form of fuzzy RPN number, which are the products of severity, occurrence and detect. From the analysis, life rafts have the highest fuzzy RPN at 351 (323 if normalized) while the lowest fuzzy RPN was obtained from railings (83.9, 5 if normalized). Life rafts were rated highest while railings were rated lowest in the fuzzy RPN number rankings. However, values obtained from the method were not as projected theoretically due to its shortcomings, such as existence of loop holes in membership functions. Future improvements of the method may include the modification of the scale tables to suit better risk assessment for any river infrastructure. In conclusion, the fuzzy FMEA method was proven to be applicable in conducting risk assessment on a river infrastructure in terms of maintenance and utilization.
format Final Year Project Report
author Franklin, Simon
author_facet Franklin, Simon
author_sort Franklin, Simon
title Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization)
title_short Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization)
title_full Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization)
title_fullStr Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization)
title_full_unstemmed Risk assessment for river transport Kuching express boat passenger terminal (maintenance & utilization)
title_sort risk assessment for river transport kuching express boat passenger terminal (maintenance & utilization)
publisher Universiti Malaysia Sarawak, UNIMAS
publishDate 2010
url http://ir.unimas.my/id/eprint/7796/1/Risk%20assessment%20for%20river%20transport%20Kuching%20express%20boat%20passenger%20terminal%20%28maintenance%20%26%20utilization%29%2024pgs.pdf
http://ir.unimas.my/id/eprint/7796/8/Franklin%20Simon%20ft.pdf
http://ir.unimas.my/id/eprint/7796/
_version_ 1776251357122002944
score 13.209306