Project evaluation : a case study of cost reduction in changing machine design
The Palong Coco Mill Company has high investment in machinery, labor and time management. This is a main constraint for company to achieve the objective and goal. The project evaluation study on the current setup (horizontal sterilizer and a new system setup (vertical sterilizer) to determine which...
Saved in:
Main Author: | Sarimah, Mat Hashim |
---|---|
Format: | Final Year Project Report |
Language: | English English |
Published: |
Universiti Malaysia Sarawak, UNIMAS
2006
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/5615/1/PROJECT%20EVALUATION-A%20CASE%20STUDY%20OF%20COST%20REDUCTION%20IN%20CHANGING%20MACHINE%20DESIGN%2824pgs%29.pdf http://ir.unimas.my/id/eprint/5615/8/Sarimah%20Mat%20Hashim.pdf http://ir.unimas.my/id/eprint/5615/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Six sigma for scrap cost reduction in remanufacturing industry
by: Mat Kiah, Missjuliana
Published: (2015) -
Design and development of noise reduction device for hand drilling machine
by: Wan Hafizee , Wan Zulkiflee
Published: (2012) -
Design of a low cost concrete rooftile making machine
by: Mahmod, Hamzah
Published: (2010) -
The design and analysist of a low cost tire endurance testing machine frame
by: Mohd Fadly, Nur Yakim
Published: (2007) -
Reduction of computational cost in driving simulation subsystems using approximation techniques
by: Mohd. Taib, Jamaludin, et al.
Published: (2014)