Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway

Flood risks not only include loss of human lives and properties, but also the transportation and communication. One major road in Kuching, the Kuching-Batu Kawa-Bau Expressway is often flooded and interrupted by floodwaters from Sarawak River. The Sarawak State Government had announced to build a fl...

Full description

Saved in:
Bibliographic Details
Main Authors: Mah, Yau Seng, Lai, S.H., Chan, R.A.@R.B., Putuhena, F.J.
Format: E-Article
Language:English
Published: Taylor & Francis Group 2012
Subjects:
Online Access:http://ir.unimas.my/id/eprint/558/1/Investigative%20modelling%20of%20the%20flood%20bypass%20channel%20in%20Kuching-Batu%20Kawa-Bau%20Expressway.pdf
http://ir.unimas.my/id/eprint/558/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimas.ir.558
record_format eprints
spelling my.unimas.ir.5582015-03-24T00:54:03Z http://ir.unimas.my/id/eprint/558/ Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway Mah, Yau Seng Lai, S.H. Chan, R.A.@R.B. Putuhena, F.J. TA Engineering (General). Civil engineering (General) Flood risks not only include loss of human lives and properties, but also the transportation and communication. One major road in Kuching, the Kuching-Batu Kawa-Bau Expressway is often flooded and interrupted by floodwaters from Sarawak River. The Sarawak State Government had announced to build a flood bypass channel in Sarawak River to mitigate flood under the Ninth Malaysian Plan. This paper is a study on the effects of the structure in the flooding of the mentioned road stretch. The January 2004 event which is locally known as a 100-year flood, was run through a developed river model incorporated with the bypass facilities. The model had indicated a reduction of 53% of flooded road. Similarly, modelling of 10 and 50-year design floods had predicted over 50% of reduction. The bypass channel was said to be able to alleviate the flooding on the major road stretch. Taylor & Francis Group 2012 E-Article NonPeerReviewed text en http://ir.unimas.my/id/eprint/558/1/Investigative%20modelling%20of%20the%20flood%20bypass%20channel%20in%20Kuching-Batu%20Kawa-Bau%20Expressway.pdf Mah, Yau Seng and Lai, S.H. and Chan, R.A.@R.B. and Putuhena, F.J. (2012) Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway. Structure and Infrastructure Engineering, 8 (7). pp. 705-714.
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
Mah, Yau Seng
Lai, S.H.
Chan, R.A.@R.B.
Putuhena, F.J.
Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway
description Flood risks not only include loss of human lives and properties, but also the transportation and communication. One major road in Kuching, the Kuching-Batu Kawa-Bau Expressway is often flooded and interrupted by floodwaters from Sarawak River. The Sarawak State Government had announced to build a flood bypass channel in Sarawak River to mitigate flood under the Ninth Malaysian Plan. This paper is a study on the effects of the structure in the flooding of the mentioned road stretch. The January 2004 event which is locally known as a 100-year flood, was run through a developed river model incorporated with the bypass facilities. The model had indicated a reduction of 53% of flooded road. Similarly, modelling of 10 and 50-year design floods had predicted over 50% of reduction. The bypass channel was said to be able to alleviate the flooding on the major road stretch.
format E-Article
author Mah, Yau Seng
Lai, S.H.
Chan, R.A.@R.B.
Putuhena, F.J.
author_facet Mah, Yau Seng
Lai, S.H.
Chan, R.A.@R.B.
Putuhena, F.J.
author_sort Mah, Yau Seng
title Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway
title_short Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway
title_full Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway
title_fullStr Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway
title_full_unstemmed Investigative modelling of the flood bypass channel in Kuching, Sarawak, by assessing its impact on the inundations of Kuching-Batu Kawa-Bau Expressway
title_sort investigative modelling of the flood bypass channel in kuching, sarawak, by assessing its impact on the inundations of kuching-batu kawa-bau expressway
publisher Taylor & Francis Group
publishDate 2012
url http://ir.unimas.my/id/eprint/558/1/Investigative%20modelling%20of%20the%20flood%20bypass%20channel%20in%20Kuching-Batu%20Kawa-Bau%20Expressway.pdf
http://ir.unimas.my/id/eprint/558/
_version_ 1644508651682004992
score 13.211869