Exploring the Hurdles and Solutions in Procuring IBS Components for Malaysian Housing Projects
The adoption of industrialized building system (IBS) needs different method to cope with its dissimilar with traditional construction as it requires different process on design, installation and precision, but yet IBS always been treated the same as conventional projects. This cause problems and thu...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
IOP Publishing
2022
|
Subjects: | |
Online Access: | http://ir.unimas.my/id/eprint/40826/3/Exploring%20the%20Hurdles%20-%20Copy.pdf http://ir.unimas.my/id/eprint/40826/ https://iopscience.iop.org/article/10.1088/1755-1315/1067/1/012062 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.unimas.ir.40826 |
---|---|
record_format |
eprints |
spelling |
my.unimas.ir.408262022-12-15T00:05:37Z http://ir.unimas.my/id/eprint/40826/ Exploring the Hurdles and Solutions in Procuring IBS Components for Malaysian Housing Projects Ahmad, Abd Jalil Shazwan, Mohamed Shaari T Technology (General) The adoption of industrialized building system (IBS) needs different method to cope with its dissimilar with traditional construction as it requires different process on design, installation and precision, but yet IBS always been treated the same as conventional projects. This cause problems and thus, this study provides a questionnaire survey comprising 24 questions delivered to experienced professionals who involved in Malaysian IBS housing projects. The aim is to ascertain the challenges and suggest solutions on procuring the IBS components focusing for Malaysian IBS housing. The collected result was then verified through several semi- structured interviews with experienced professionals from various field involve in IBS. This study finds that the main challenges in procuring IBS components are surround by factors on price, logistical barriers, and inadequacy on terms of agreement, The result also revealed in most IBS housing projects, the contract agreement between IBS manufacturers and main contractors were often breached especially on payment mechanism, amount and delivery time. Due to payment problems, some IBS manufacturers take unilateral action by stop delivery the IBS components, causing delay to the project, while others pursue the case to court, which also prolong into litigation. Contribution of this research is on the highlighting several urgent issues in the context of procuring IBS components for Malaysian housing. The findings reveal due to the unsolved issues, IBS targets to reduce cost and faster completion is hard to achieve, while exposing the project to end with delay or litigation. IOP Publishing 2022 Article PeerReviewed text en http://ir.unimas.my/id/eprint/40826/3/Exploring%20the%20Hurdles%20-%20Copy.pdf Ahmad, Abd Jalil and Shazwan, Mohamed Shaari (2022) Exploring the Hurdles and Solutions in Procuring IBS Components for Malaysian Housing Projects. IOP Conf. Series: Earth and Environmental Science, 1067. pp. 1-8. ISSN 1755-1315 https://iopscience.iop.org/article/10.1088/1755-1315/1067/1/012062 doi:10.1088/1755-1315/1067/1/012062 |
institution |
Universiti Malaysia Sarawak |
building |
Centre for Academic Information Services (CAIS) |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Malaysia Sarawak |
content_source |
UNIMAS Institutional Repository |
url_provider |
http://ir.unimas.my/ |
language |
English |
topic |
T Technology (General) |
spellingShingle |
T Technology (General) Ahmad, Abd Jalil Shazwan, Mohamed Shaari Exploring the Hurdles and Solutions in Procuring IBS Components for Malaysian Housing Projects |
description |
The adoption of industrialized building system (IBS) needs different method to cope with its dissimilar with traditional construction as it requires different process on design, installation and precision, but yet IBS always been treated the same as conventional projects. This cause problems and thus, this study provides a questionnaire survey comprising 24 questions delivered to experienced professionals who involved in Malaysian IBS housing
projects. The aim is to ascertain the challenges and suggest solutions on procuring the IBS components focusing for Malaysian IBS housing. The collected result was then verified through several semi- structured interviews with experienced professionals from various field involve in IBS. This study finds that the main challenges in procuring IBS components are surround by factors on price, logistical barriers, and inadequacy on terms of agreement, The
result also revealed in most IBS housing projects, the contract agreement between IBS manufacturers and main contractors were often breached especially on payment mechanism, amount and delivery time. Due to payment problems, some IBS manufacturers take unilateral
action by stop delivery the IBS components, causing delay to the project, while others pursue the case to court, which also prolong into litigation. Contribution of this research is on the highlighting several urgent issues in the context of procuring IBS components for Malaysian housing. The findings reveal due to the unsolved issues, IBS targets to reduce cost and faster completion is hard to achieve, while exposing the project to end with delay or litigation. |
format |
Article |
author |
Ahmad, Abd Jalil Shazwan, Mohamed Shaari |
author_facet |
Ahmad, Abd Jalil Shazwan, Mohamed Shaari |
author_sort |
Ahmad, Abd Jalil |
title |
Exploring the Hurdles and Solutions in Procuring IBS
Components for Malaysian Housing Projects |
title_short |
Exploring the Hurdles and Solutions in Procuring IBS
Components for Malaysian Housing Projects |
title_full |
Exploring the Hurdles and Solutions in Procuring IBS
Components for Malaysian Housing Projects |
title_fullStr |
Exploring the Hurdles and Solutions in Procuring IBS
Components for Malaysian Housing Projects |
title_full_unstemmed |
Exploring the Hurdles and Solutions in Procuring IBS
Components for Malaysian Housing Projects |
title_sort |
exploring the hurdles and solutions in procuring ibs
components for malaysian housing projects |
publisher |
IOP Publishing |
publishDate |
2022 |
url |
http://ir.unimas.my/id/eprint/40826/3/Exploring%20the%20Hurdles%20-%20Copy.pdf http://ir.unimas.my/id/eprint/40826/ https://iopscience.iop.org/article/10.1088/1755-1315/1067/1/012062 |
_version_ |
1753792649428467712 |
score |
13.211869 |