Resetting the ground fault relay on a 28 MVA power transformer due to grounding method retrofit
. The goal of the retrofit at Zamrud substation is to transform a 28 MVA power transformer's neutral point grounding system from direct grounding to grounding using a 20 Ohm Neutral Grounding Resistor (NGR). The amount of short-circuit current produced will fluctuate with the installation of NG...
Saved in:
Main Authors: | Hamzah, Eteruddin, Arlenny, -, Hadiana, Siswanto, Yanuar Z., Arief, Fathimah, Hasanti |
---|---|
Format: | Proceeding |
Language: | English |
Published: |
IOP Publishing
2022
|
Online Access: | http://ir.unimas.my/id/eprint/40381/1/Resetting%20the%20ground%20-%20Copy.pdf http://ir.unimas.my/id/eprint/40381/ https://iopscience.iop.org/article/10.1088/1755-1315/1041/1/012021 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
AC interference on gas pipelines due to phase to ground faults in overhead transmission lines
by: El Gayar, A. I., et al.
Published: (2016) -
Coal Fuel Efficiency with Mixed Palm Shell Biomass for Steam Power Plant
by: Hamzah, Eteruddin, et al.
Published: (2021) -
The application of phase and ground distance relay to three terminal lines
by: Mohd Shah Rizan Ahmad Maidin
Published: (2009) -
Experts: we need a reset
by: Tang, Ashley
Published: (2021) -
Ahli politik, pakar perlu reset
by: Nazrin, Zulkafli
Published: (2021)