ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS

Providing adequate proper housing is one of Malaysian government agenda towards becoming a develop nation in Wawasan Kemakmuran Bersama 2030. Under previous Construction Industry Transformation Plan (CITP) 2015, the government aims to provide enough and comfortable residential to all citizen, and ac...

Full description

Saved in:
Bibliographic Details
Main Authors: Ahmad, Abd Jalil, Shazwan, Mohamed Shaari, Areefah Batrisyia, Norhisham
Format: Proceeding
Language:English
Published: 2021
Subjects:
Online Access:http://ir.unimas.my/id/eprint/37230/1/Shazwan%20Mohamed%20Shaari2.pdf
http://ir.unimas.my/id/eprint/37230/
https://umevent.um.edu.my/IBCC2021
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimas.ir.37230
record_format eprints
spelling my.unimas.ir.372302021-12-16T08:06:01Z http://ir.unimas.my/id/eprint/37230/ ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS Ahmad, Abd Jalil Shazwan, Mohamed Shaari Areefah Batrisyia, Norhisham TH Building construction Providing adequate proper housing is one of Malaysian government agenda towards becoming a develop nation in Wawasan Kemakmuran Bersama 2030. Under previous Construction Industry Transformation Plan (CITP) 2015, the government aims to provide enough and comfortable residential to all citizen, and achieve a better standard of construction where prefabrication concept in housing replaces the conventional concept. The advantages of prefabrication concept are numerous including reducing the dependency on foreign labours, better quality, cost saving and speed. So long our local residentials have already familiar with conventional method, thus shifting into prefabricated concept is no easy task. Numerous efforts have been taken by Construction Industry Development Board of Malaysia (CIDB) and the government to ensure the prefabricated residential will become the preferred choice by developers. However, the uptake has been very slow and the target seem likely unachievable due to many reasons. Therefore, there is an urgency to know what are the difficulties that the industry facing in adopting prefabricated housing and what steps can be taken to overcome those problems. This paper discusses the barriers in implementing prefabricated concept in residential and the drivers that can speed up the application. The discussion based on published journals and articles that prioritize the views from all major players in prefabricated residential projects including contractors, developers, clients, consultants and prefabrication manufacturers and installers. This research contributes to the body of knowledge by revealing the true reason of why prefabricated housing is hard to be implemented, where the arguments combine the views from all major players. This study also provides steps to solve the problems taken from experience from other successful countries. 2021 Proceeding PeerReviewed text en http://ir.unimas.my/id/eprint/37230/1/Shazwan%20Mohamed%20Shaari2.pdf Ahmad, Abd Jalil and Shazwan, Mohamed Shaari and Areefah Batrisyia, Norhisham (2021) ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS. In: 5TH INTERNATIONAL BUILDING CONTROL CONFERENCE (IBCC) 2021, 25-26 November 2021, Kuala Lumpur, Malaysia. https://umevent.um.edu.my/IBCC2021
institution Universiti Malaysia Sarawak
building Centre for Academic Information Services (CAIS)
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Sarawak
content_source UNIMAS Institutional Repository
url_provider http://ir.unimas.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Areefah Batrisyia, Norhisham
ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS
description Providing adequate proper housing is one of Malaysian government agenda towards becoming a develop nation in Wawasan Kemakmuran Bersama 2030. Under previous Construction Industry Transformation Plan (CITP) 2015, the government aims to provide enough and comfortable residential to all citizen, and achieve a better standard of construction where prefabrication concept in housing replaces the conventional concept. The advantages of prefabrication concept are numerous including reducing the dependency on foreign labours, better quality, cost saving and speed. So long our local residentials have already familiar with conventional method, thus shifting into prefabricated concept is no easy task. Numerous efforts have been taken by Construction Industry Development Board of Malaysia (CIDB) and the government to ensure the prefabricated residential will become the preferred choice by developers. However, the uptake has been very slow and the target seem likely unachievable due to many reasons. Therefore, there is an urgency to know what are the difficulties that the industry facing in adopting prefabricated housing and what steps can be taken to overcome those problems. This paper discusses the barriers in implementing prefabricated concept in residential and the drivers that can speed up the application. The discussion based on published journals and articles that prioritize the views from all major players in prefabricated residential projects including contractors, developers, clients, consultants and prefabrication manufacturers and installers. This research contributes to the body of knowledge by revealing the true reason of why prefabricated housing is hard to be implemented, where the arguments combine the views from all major players. This study also provides steps to solve the problems taken from experience from other successful countries.
format Proceeding
author Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Areefah Batrisyia, Norhisham
author_facet Ahmad, Abd Jalil
Shazwan, Mohamed Shaari
Areefah Batrisyia, Norhisham
author_sort Ahmad, Abd Jalil
title ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS
title_short ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS
title_full ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS
title_fullStr ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS
title_full_unstemmed ACCELERATING PREFABRICATED CONCEPT IN RESIDENTIAL PROJECTS; HURDLES AND DRIVERS
title_sort accelerating prefabricated concept in residential projects; hurdles and drivers
publishDate 2021
url http://ir.unimas.my/id/eprint/37230/1/Shazwan%20Mohamed%20Shaari2.pdf
http://ir.unimas.my/id/eprint/37230/
https://umevent.um.edu.my/IBCC2021
_version_ 1720440434179702784
score 13.211869